Adjustment
4. Adjust the AT Head Height
A When the Level Increases by Pressing
Down the Tape
Turn the height adjustment screw clockwise so
that the output level is maximum. (Fig. 1)
B When the Level Increases by Pushing Up
the Tape
(1) Turn the height adjustment screw counter-
clockwise to maximize the output level.
Turn the height adjustment screw counter-
clockwise furthermore to decrease the output
level slightly. (Arrow 1 in Fig. 2)
(2) Turn the height adjustment screw clockwise
and adjust so that the output level is maxi-
mum. (Arrow 2 in Fig. 2)
n
To stabilize the AT head height after the
adjustment, set the maximum output level
with the AT head moved upward (with the
height adjustment screw turned clockwise).
After the Adjustment
5. Adjust the AT Head Azimuth
Refer to Section 6-8.
6. Adjust the AT Head Head-to-tape
Contact
Refer to Section 6-9.
7. Adjust the AT Head Position
Refer to Section 6-10.
8. Recheck the AT Head Height
Refer to step 3 in this section.
9. Recheck the AT Head
Perform the steps 5 through 7 again.
10. Apply the Locking Compound
Refer to Section 6-1-9.
SRW-5000/5500
<Fig.1>
Height adjustment screw
<Fig.2>
Maximum Output Level Point
1
2
Height adjustment screw
(Top view)
AT Head Height Adjustment
CUE
C
Make the portion C maximize.
CUE
C
Make the portion C maximize.
6-29