Page 1
HD DIGITAL VIDEOCASSETTE RECORDER SRW-5000 SRW-5500 FORMAT CONVERTER BOARD HKSR-5001 DIGITAL BETACAM PROCESSOR BOARD HKSR-5002 RGB PROCESSOR BOARD HKSR-5003 MAINTENANCE MANUAL Volume 1 1st Edition (Revised 2)
Page 2
à moins d’être qualifié pour en effectuer d’autres. Pour toute réparation faire appel à une personne compétente uniquement. Attention-when the SRW-5000 is installed in Rack: 1. Prevention against overloading of branch circuit 4. Prevention against achieving hazardous...
Page 3
Gerät abschaltet und signalisiert “Batterie leer” oder nach längerer Gebrauchsdauer der Batterien “nicht mehr einwandfrei funktioniert”. Um sicherzugehen, kleben Sie die Batteriepole z.B. mit einem Klebestreifen ab oder geben Sie die Batterien einzeln in einen Plastikbeutel. 1 (P) SRW-5000/5500...
1-19-1. Equipment for Check/Adjustment ..........1-40 1-19-2. Fixtures ..................1-41 1-20. Alignment Tapes ..................1-43 1-21. Tools for Board Extension ................ 1-46 1-22. Writing and Rewriting the PLD Internal Data .......... 1-47 1-23. Internal Video Test Signal ................ 1-48 1-24. Unleaded Solder ..................1-51 SRW-5000/5500...
Page 6
1-25-36. TX-96 Board ................1-58 1-25-37. VPR-79 Board ................1-58 1-26. Memory Stick (or Memory Card) ............. 1-58 1-27. Video Head Location ................1-61 2. Error Messages 2-1. Overview of Error Messages ............... 2-1 2-2. Details of Error Messages ................2-3 SRW-5000/5500...
Page 7
Tape Running Surface of Upper Drum Cleaning ....... 4-8 4-2-5. Tape Running Surface of Lower Drum and Lead Surface Cleaning ............... 4-9 4-2-6. Stationary Heads Cleaning ............4-10 4-2-7. Tape Running System and Tape Cleaner Cleaning ....4-11 4-2-8. Cassette Compartment and Cassette Supports Cleaning ..4-12 SRW-5000/5500...
Page 8
5-26. LCD Unit and Lamp Unit Replacement ............ 5-94 5-26-1. LCD Unit Replacement ............5-94 5-26-2. Lamp Unit Replacement ............5-97 5-27. Organic EL Indicator Module Replacement ..........5-99 5-28. Inverter Unit Replacement ..............5-101 5-29. PC Card Adaptor Replacement ............... 5-103 SRW-5000/5500...
Page 9
6-10. AT Head Position Check and Adjustment ..........6-35 6-11. CUE Level Check and Adjustment in REV Mode ........6-38 6-12. Tape Running Check and Adjustment ............6-40 6-12-1. Tape Entrance Side ..............6-40 6-12-2. Tape Exit Side ................6-42 SRW-5000/5500...
Page 10
HDCAM SR DT System Adjustment ........8-7 8-3-6. HDCAM DT System Adjustment ..........8-8 8-3-7. HDCAM SR SAT Signal Level Adjustment ......8-8 8-3-8. HDCAM SAT Signal Level Adjustment (SRW-5500 only) ..8-9 8-3-9. HDCAM SR DT Measurement ..........8-9 SRW-5000/5500...
..Protocol Manual of Remote (9-pin) Connector (available on request) This manual explains the protocol for controlling the VTR via the RS-422A (9-pin serial remote). If this manual is required, please contact your local Sony Sales Office/Service Center.
Section 5. Section 7 Electrical Alignment after Main Parts Replacement Explains the electrical alignment associated with replacement of parts that are described in Section 5. Section 8 Electrical Alignment Explains the electrical alignment for the maintenance of the unit. SRW-5000/5500...
Page 15
Describes the block diagrams of overall and each board. Section 4 Board Layouts Describes the board layouts for the unit. Maintenance manual Section 1 Schematic Diagrams and Frame Wiring volume 3 Describes the schematic diagrams and frame wiring for the unit. (9-968-024-0X) SRW-5000/5500...
“4-2-2. General Information for Cleaning using Cleaning Cloth”. Removal Installation When reattaching the upper lid (front) assembly, install in the reverse order of removal. Tighten the fixing screw as following torque. Tightening torque: 120 x 10 N.m {12.0 kgf.cm} SRW-5000/5500...
Bottom plate BVTT3 x 6 Hooks When reattaching, install in the reverse order of removal. When reattaching, install in the reverse order of removal. Tighten the fixing screws as following torque. Tightening torque: 120 x 10 N.m {12.0 kgf.cm} SRW-5000/5500...
When reattaching the front panel, press it tightly against the chassis in parallel. PSW3 x 6 Front panel 3 x 6 Lower control panel 3 x 6 Use of screws other than specified will cause damage of the internal mechanism. Be sure to use the specified screws. SRW-5000/5500...
(Refer to Section 1-12.) Harnesses AC panel assembly AC inlet When reattaching, install in the reverse order of removal. . Connect the harnesses to the AC inlet correctly. . For connecting connector of the coaxial cables, refer to Section 1-12. SRW-5000/5500...
When reattaching, install in the reverse order of removal. Connector panel Push in portions A of the connector panel assembly, and assembly connect it firmly to the connector of the mother board. BVTT3 x 6 Portion A Portion A Connector panel assembly SRW-5000/5500...
CL-29 board. Keep the harness out of the way (If it is put with the cassette lid down, the flexible of the removal. card wire/board might be damaged.) Cassette compartment BVTT3 x 6 Cassette compartment (with stopper) bracket assembly Harness CN930 SRW-5000/5500...
Page 23
Positioning hole Harness SC guide assembly 8. Connect the harness to the connector (CN930) on the CL-29 board. 9. Being careful not to pinch the harness, reattach the cassette compartment bracket assembly. 10. Reattach the upper lid (front) assembly. SRW-5000/5500...
5. Remove the two screws shown in the figure. POWER Unlock button Power OFF System setup panel Unlock button B3 x 6 Cable Lower control panel unit B3 x 6 SRW-5000/5500...
HIF-8 HD SDI signal processor (Character superimpose, HD video signal process, RGB to Dual-link convert) HPR-8 (SRW-5000) HDCAM SR PB video signal processor (BRR decode), HDCAM (ADV PB)/Digital Betacam video signal processor (Slow process, SD-HD up convert), PB digital audio sample-change (Sampling-rate convert,...
1-9. Function and Location of Sensors < Top View of Mechanical Deck > Upper Lower < Top View of Cassette Compartment > 1-14 SRW-5000/5500...
Page 31
This sensor detects whether the inserted cassette is L used to discriminate whether it is the HDCAM SR size or S size. cassette. @[ Cassette-in sensor (L) This sensor detects whether a cassette is being inserted. *: Also refer to “1-10. System of Cassettes”. 1-15 SRW-5000/5500...
Reel hub diameter detection tab With tab (close hole): Small hub Without tab (open hole): Large hub (Cleaning tape etc.) S cassette digital REC inhibit tab L cassette digital REC inhibit tab L cassette analog REC inhibit hole 1-16 SRW-5000/5500...
Page 33
Only playback is enabled. HDCAM SR or MPEG IMX The MPEG IMX is unusable. The tape thickness detection tab 2 detects the HDCAM SR cassette. 2 Without tab: HDCAM SR With tab: Other than HDCAM SR Except the above class Unusable 1-17 SRW-5000/5500...
EJECT label to take up the Knob Upper lid (front) assembly tape inside the cassette. AE-31H board Board holder Knob Fixing screw Removal Installation EJECT M gear EJECT label label ME wire Wire holder Gear box assembly 1-18 SRW-5000/5500...
Page 35
On completely winding up the tape into the cassette, the M gear will be tighten. (Unthreading end state) 11. Open the lower control panel. 12. Turn the eject knob in the arrow direction on the label until the cassette is completely ejected. Label Eject knob 1-19 SRW-5000/5500...
TX-96 board. When removing the coaxial cables, hold the plug to remove. Do not attempt to remove by pulling the cable. OK Hold the plug to Do not attempt to remove. remove by pulling the cable. 1-20 SRW-5000/5500...
Page 37
CN1200 CN100 blue CN300 CN302 CN301 Bead ties Wire holder HIF-8 Board (TX-96 Board) black black FC-91 Borad (TX-96 Board) : HKSR-5001 black CN204 CN203 CN204 CN203 CN204 CN204 TX-96 TX-96 TX-96 TX-96 (HKSR-5003) (HKSR-5003) CN203 CN204 TX-96 1-21 SRW-5000/5500...
Blinks when the control panel is operating normally. Blinks 1 second light and 1 second off. D501 — Green High-speed blinks when the control panel is operating normally. Blinks D502 — Green Not used D503 — Not used 1-22 SRW-5000/5500...
Page 39
Factory use D2804 BVC2.ERR Green Factory use D2805 BVC2.ERI Green Factory use D2901 — Green Factory use D2902 — Green Lights when REC mode. D2903 — Green Blinks when the comminucation between to the SS-95 board is Blinks normal. 1-23 SRW-5000/5500...
Page 40
Name Color Description Normal state (Power: ON) D2201 — Green Lights when the PLD3 (IC2100/HPR-8 board, HPR-8A board) configuration. D2203 — Factory use D2204 — Green Blinks when the PLD2 (IC1200/HPR-8 board, HPR-8A board) is Blinks operating normally. 1-24 SRW-5000/5500...
Page 41
D1905 — Factory use D1906 — Green Blinks when the PLD1 (IC300/IRC-5 board, IRC-5A board) is Blinks operating normally. D1907 — Factory use D1908 — Green Blinks when the PLD2 (IC1500/IRC-5 board, IRC-5A board) is Blinks operating normally. 1-25 SRW-5000/5500...
Page 42
Lights when the PLD3 (IC700/VPR-79 board) configuration. D2005 — Factory use D2006 — Green Blinks when the PLD1 (IC104/VPR-79 board) is operating normally. Blinks D2007 — Factory use D2008 — Green Blinks when the PLD2 (IC910/VPR-79 board) is operating normally. Blinks 1-26 SRW-5000/5500...
1-14. Description of Switch Functions AE-31H Board S100 S200 AE-31 Board (Side A) < Top View > The switches S100, S200 on the AE-31H board are not used for the unit. It is not necessary to change the setting of these switches. 1-27 SRW-5000/5500...
Page 44
S1300 S2300 +4 dBm/_18 dBm +4 dBm/_16 dBm +6 dBm/_20 dBm 0 dBm/_12 dBm Others Ref. No. Name Description Factory setting S400 1 to 4 — Factory use S701 1 to 3 — Factory use — Factory use 1-28 SRW-5000/5500...
Page 45
CP-382 Board (Side A) < Front View > Ref. No. Name Description Factory setting — Factory use 2, 3 — Factory use 4 to 8 — Factory use 1 to 8 — Factory use S300 1 to 4 — Factory use 1-29 SRW-5000/5500...
Page 46
Switches state (\ \ \ \ \ : Knob position) S100 (available in SRW-5500 only) +4 dBm/600 Z 0 dBm/600 Z _3 dBm/600 Z _20 dBm/600 Z (Factory setting) S101 +4 dBm/600 Z 0 dBm/600 Z _3 dBm/600 Z _20 dBm/600 Z (Factory setting) 1-30 SRW-5000/5500...
Page 47
Never change the settings of the factory use switches. Refer to Section 1-12 for removing/reattaching the plug-in board. S900 HIF-8 Board (Side A) < Top View > Ref. No. Name Description Factory setting S900 1 to 4 — Factory use 1-31 SRW-5000/5500...
Page 48
HPR-8 Board/HPR-8A Board (Side A) < Top View > Ref. No. Name Description Factory setting S200 1 to 6 — Factory use — Factory use — Factory use S600 1 to 4 — Factory use S2000 1 to 4 — Factory use 1-32 SRW-5000/5500...
Page 49
< Top View > Ref. No. Name Description Factory setting S400 1 to 4 — Factory use S700 1 to 4 — Factory use S800 1, 2 — Factory use — Factory use 4 to 8 — Factory use 1-33 SRW-5000/5500...
Page 50
OFF : Activaes the DT operation 4 to 8 — Factory use S1001 — Press to stop/update SV log — S1002 — R-SHFT Press to change reel position — Does not function when the cassette is inserted in this unit. 1-34 SRW-5000/5500...
Page 51
Refer to Section 1-12 for removing/reattaching the plug-in board. S100 S700 VPR-79 Board (Side A) < Top View > Ref. No. Name Description Factory setting S500 1 to 4 — Factory use S700 1 to 4 — Factory use 1-35 SRW-5000/5500...
On-chip fuse 3.15 A, 125 V On-chip fuse 3.15 A, 125 V ! 1-576-212-21 F2003 (A-5) F702 (D-1) ! 1-576-212-21 On-chip fuse 1.25 A, 125 V F703 (D-1) On-chip fuse 1.25 A, 125 V F704 (D-1) F705 (C-1) 1-36 SRW-5000/5500...
. POWER ON BANK RECALL setting data 3. Remove the eight screws, and remove the rear cover of the lower control panel. Backup battery B3 x 6 Rear cover Refer to Section 1-17. B3 x 6 Lower control panel 1-37 SRW-5000/5500...
Page 54
Memory Stick to the unit. 9. Perform the following settings again. (Refer to the “Service action after replacing” in Section 1-18.) . VTR bank data . Headroom of the audio level meter . Calendar/Clock . 50-pin remote setting data . Network information 1-38 SRW-5000/5500...
50-pin remote setting data CHECK menu. (Refer to Section 3-3-9.) Set by the [F3] (NETWORK SETUP) of the OTHERS CHECK Network information menu. (Refer to Section 3-3-9.) Refer to Section 3 for the menu of the maintenance mode. 1-39 SRW-5000/5500...
— 75 Z, BNC type BNC T adapter — 75 Z Recording tape Sony BCT-SR series S cassette tape for HDCAM SR Sony BCT-SRL series L cassette tape for HDCAM SR For check/adjust the tape path. Sony BCT-HD series Cassette tape for HDCAM...
1-20. Alignment Tapes Describes the alignment tapes used for adjusting the unit. 1. HR5-1B (SONY part No. 8-960-076-31) : For HDCAM SR Used for video/audio adjustment of the unit. Time (min. : sec.) Digital video Digital audio CUE track CTL track...
Page 60
3. HR5-1A (SONY part No. 8-960-076-01) : For HDCAM Used for video/audio adjustment of the unit. Time (min. : sec.) Digital video Digital audio CUE track CTL track 00:00 - 100 % color-bar 1 kHz sine wave, _20 dB FS...
Page 61
5. ZR5-1 (SONY part No. 8-960-073-01) : For 525/60 Digital Betacam system ZR5-1P (SONY part No. 8-960-073-51) : For 625/50 Digital Betacam system Used for video/audio adjustment of the unit (HKSR-5002 installed model only). Time (min. : sec.) Digital video...
DR-508 board is opened state. For Large Plug-in Board Description: Extension flexible board (FL-276) Description: Extension board, EX-873 SONY part No.: 1-677-293-21 SONY part No.: A-8346-141-A DR-508 board For Connector Panel Use the following boards and support to extend the connector panel.
Writing and rewriting the PLD internal data shown below SONY Part No. : A-8347-714-A supported by the e-Production (EPR) system. If the PLD needs to be upgraded, contact your Sony Sales Extending procedure Office/Service Center. (1) Remove one screw and remove the CUE-13 board.
SD video test signals . Maintenance mode [F2] (VIDEO TST SG) of the SD OUT CHECK menu. Download the Project file from the Sony Database Server. For details, refer to Section 3-3-6. 2. Turn off the power of this unit. Connect the PC...
Page 65
HD video test signals Color Bars Ramp Multi Burst Black 10 steps Pathlogical (1) Pluse and Bar Pathlogical (2) 1-49 SRW-5000/5500...
Page 66
SD video test signals Color Bars Ramp Multi Burst Black Burst 10 steps Pathlogical Pluse and Bar 1-50 SRW-5000/5500...
MOTOR) of the SERVO CHECK menu. (Refer to Section 3-3-4.) 1-25-4. CL-29 Board After replacing and repairing this board, check that the cassette compartment moves up and down normally using [F8] (CCM MOTOR) of the SERVO CHECK menu. (Refer to Section 3-3-4.) 1-51 SRW-5000/5500...
10. Return the settings of the analog audio and monitor . Time code generator: output level/headroom and setup menu, which were . Sony BVG-1600/1600PS or equivalent changed for the checks, to the customer settings. . Time code reader: Sony BVG-1500/1500PS or equivalent .
Confirm that the STOP lamp does not blink on the control panel. If the STOP lamp blinks, check that the ITEM-005 setting in the setup menu is correct and that the sync signal is correctly input to the REF.INPUT 1 connec- tor. 1-53 SRW-5000/5500...
After replacing and repairing this board, adjust the CUE EBU) INPUT/OUTPUT CH3/4 to CH11/12 connec- playback system (Section 8-5-4). tors. 6. Return the settings of the AUDIO menu, which were changed for the checks, to the customer settings. 1-54 SRW-5000/5500...
After replacing and repairing this board, check that the 4. Check that the data can be written to or read from a audio and video can be recorded/played back normally to Memory Stick. the cassette tape. 1-55 SRW-5000/5500...
[F2] (CASSTT CMP. SW) of the SERVO CHECK menu. (Refer to Section 3-3-4.) After replacing this board, check that the audio and video are recorded/played back normally to the cassette tape. 1-56 SRW-5000/5500...
4. Check that each DIP switch on the new board is the factory setting. (Refer to Section 1-14.) 5. Remove the backup battery from IC116 on the new board, and install it again after a while. (Refer to Section 1-17.) 1-57 SRW-5000/5500...
3. Press the [F1] (FORMAT CARD) key. . A confirmation message appears. . To cancel formatting, press the CLR key while the confirmation message is being displayed. 4. While pressing the [SFT] (SHIFT) key, press the [F1] (FORMAT CARD) key. 1-58 SRW-5000/5500...
Page 75
. To change the title, press the [F6] (EDIT TITLE) key. 6. Press the [F9] (COPY) key. . A confirmation message appears. 7. While pressing the [SFT] (SHIFT) key, press the [F9] (COPY) key. 8. Press the [F10] (EXIT) key to return to the setup menu. 1-59 SRW-5000/5500...
Page 76
Updating the Software A Memory Stick (or memory card) with the new version software is required for updating the software. Please contact your local Sony Sales Office/Service Center to memorize the updating software. It is possible to update the following incorporated soft- ware.
Recording format HDCAM SR HDCAM SR HDCAM Playing back format HDCAM SR HDCAM SR HDCAM HDCAM Digital Betacam Digital Betacam 1 SRW-5000 (Top view) DHH-05A HDCAM HDCAM HDCAM SR HDCAM SR HDCAM SR FE HDCAM SR H1/H2 A1/A2 G1/G2 B1/B2...
. When the two or more errors are detected simultaneously, the only one of them is displayed in the color display. The others are displayed by pressing the cursor keys [(]/[)]. ERROR indicator SRW-5000 HD DIGITAL VIDEO CASSETTE RECORDER Cursor keys [(]/[)] Color display...
Page 80
The communication error of FC CPU (on FC-91 board) is detected. (HKSR-5001 installed model only) SY-50PIN INTERFACE 2-16 The communication error of CPU (on CP-378 board) for the 50-pin parallel remote ERROR interface is detected. SV UNDEFINE ERROR 2-16 Servo system errors other than the above are detected. SRW-5000/5500...
. Take-up reel table height adjustment defect Protecting operation: Switches to the protection mode. Be sure to take out the cassette manually (refer to Section 1-11). Do not turn on the power again with the cassette tape in to avoid damage the tape. SRW-5000/5500...
Page 82
If this error occurred at the tape end, the VTR may be recovered to the normal state automatically from the protection mode. Be sure to take out the cassette manually (refer to Section 1-11). Do not turn on the power again with the cassette tape in to avoid damage the tape. SRW-5000/5500...
Page 83
. Tape abnormality (The winding state has a problem.) Protecting operation: Switches to the protection mode. Be sure to take out the cassette manually (refer to Section 1-11). Do not turn on the power again with the cassette tape in to avoid damage the tape. SRW-5000/5500...
Page 84
. Supply or take-up reel motor drive circuit (DR-508 board) trouble . Servo adjustment defect on supply or take-up reel . Supply or take-up reel brake trouble . Supply or take-up reel brake solenoid drive circuit (DR-508 board) trouble . Harness disconnection Protecting operation: Ejects the cassette. SRW-5000/5500...
Page 85
. Capstan motor FG waveform shaper circuit (SS-95 board) trouble . Capstan FG duty adjustment defect Protecting operations: Ejects the cassette for No. 1 in detecting conditions. Stops the tape transport and switches to the rest state for No. 2 and No. 3 in detecting conditions. SRW-5000/5500...
Page 86
. Threading motor drive circuit (IC500 on DR-508 board) trouble . Threading mechanism trouble Protecting operations: Ejects the cassette during cassette insertion or ejection. Switches to the protection mode during tape threading/unthreading. Stops the tape transport and switches to the rest state in cases except the above. SRW-5000/5500...
Page 87
Stops the tape transport and eject the cassette tape, then switches to the rest state when the tape is threaded in states other than PLAY and REC mode. Prohibits the tape threading. (Rotates the drum at low speed.) Prohibits the cassette insertion. SRW-5000/5500...
Page 88
During tape transport in forward direction, the FF mode can be entered only while the total tape quantity is observed. Stops the tape transport and switches to the rest state during tape transport except the above. 2-10 SRW-5000/5500...
Page 89
. Fan motor FG input circuit (IC909, 912 on SS-95 board) trouble Protecting operation: None This unit has five fan motors. All fan motors always operate when power of the VTR is turned on. When the above detecting condition is satisfied by any fan motor, this error occurs. 2-11 SRW-5000/5500...
Page 90
. Reel position sensor (PH203, PH204 on DR-508 board) trouble (S position sensor or L position sensor) . Reel position input port (IC100 on DR-508 board) trouble Protecting operation: Stops the movement of the reel table and ejects the cassette during cassette loading. 2-12 SRW-5000/5500...
Page 91
Malfunction of DT head was detected. Detecting condition: When the HDSR DT and HDCAM DT adjustments are abnormaly done. Sub error message: None . Slip ring trouble Possible causes: . DT-47 board trouble . DT head trouble . Drum trouble 2-13 SRW-5000/5500...
Page 92
Displays only this error. ERROR-A5 SY-FC DPRAM ERROR Description: The abnormal operation of an DPRAM (IC1425 on FC-91 board) between SYS1 and FC was detected. Possible cause: DPRAM (IC1425 on FC-91 board) trouble Protecting operation: Displays only this error. 2-14 SRW-5000/5500...
Page 93
The communication error of EQ CPU (IC2912 on EQ-94 board) was detected. . EQ CPU (IC2912 on EQ-94 board) trouble Possible cause: . When the EQ CPU (IC2912 on EQ-94 board) initialization is in abnormal state. Protecting operation: Displays only this error. 2-15 SRW-5000/5500...
Page 94
Possible cause: . When the CPU (IC320 on CP-378 board) initialization is in abnormal state. Protecting operation: Displays only this error. ERROR-FF SV UNDEFINE ERROR Description: The undefined error was detected in the servo system (servo control system). 2-16 SRW-5000/5500...
OPTION MAINTE EXIT DT/SAT SDOUT EXIT DIAG DIAG EXEC MAINTENANCE menu ......(Section 3-3) This menu is mainly used for checks of this unit. MAINTENANCE MAINTE PANEL CHECK SERVO CHECK SDOUT OTHERS EXIT DIAG CHECK CHECK CHECK CHECK CHECK SRW-5000/5500...
Page 96
The MAINTENANCE menu is displayed. 3. On the MAINTENANCE menu, press the ALT button. The ALT MAINTENANCE menu is displayed. Exiting maintenance mode On each menu, press the [F10] (EXIT) key several times until the HOME menu appears on the color display. SRW-5000/5500...
(Refer to Section 3-2-4.) [F8] (MAINTE EXEC) Key Press the [F8] (MAINTE EXEC) key while pressing [SFT] (SHIFT) key to display the MAINTENANCE menu. (Refer to Section 3-3.) [F10] (EXIT) Key Exits the MAINTENANCE INFORMATION menu and returns to the HOME menu. SRW-5000/5500...
[F5] (WARNING) Key CLEAR) key only. Selects whether to display warning messages. on (factory setting)/off [F6] (ERROR) Key Selects whether to display error messages. on (factory setting)/off [F7] (CONDITION) Key Selects whether to display condition messages. on (factory setting)/off SRW-5000/5500...
Page 99
05.PLL UNLOCK ON FC ZERO SEAZON EXIT 08.NO SDI INPUT DIAG STAND CANCEL TOTAL:01 EXIT DIAG (2) Set the time difference with the GMT using the [(]/[)] key. Setting range is +24 H to _24 H. The factory setting is +0 H. SRW-5000/5500...
Page 100
(3) Press the [F6] (SET) key while pressing the [SFT] (SHIFT) key. [SFT] (SHIFT) key. STANDARD: Standard time To cancel the setting, press the [F6] (SET) key SUMMER: Daylight saving time (The time only. preceding standard time by one hour) SRW-5000/5500...
– – – – – – – – – FUNC EXIT DIAG INFO FUNC EXIT DIAG INFO [F7] (FUNC INFO) Key Displays functions of the option board. [F10] (EXIT) Key Exits the OPTION INFORMATION menu, and returns to the MAINTENANCE INFORMATION menu. SRW-5000/5500...
[F7] (RF CHECK) Key Checks the RF system. (Refer to Section 3-3-7.) [F8] (A/V CHECK) Key Sets up system E-E function and the audio/video test signal generator built in this unit for the maintenance mode. (Refer to Section 3-3-8.) SRW-5000/5500...
To display the ROM MAINTENANCE menu, press the Please contact your local Sony Sales Office/Service Center [F2] (ROM MAINTE) key in the MAINTENANCE menu. to update the software. 1. Connect a Memory Stick (or memory card) that the...
[F7] (KEY) Key the power, and turn it on again. Performs operation checks for the keys. [F8] (LED) Key Performs lighting checks for the LEDs. [F10] (EXIT) Key Exits the PANEL CHECK menu, and returns to the MAINTENANCE menu. 3-10 SRW-5000/5500...
Page 105
SHUTTLE is displayed when the search dial is released. When the Dial mode sensor is D- B3 x 14 2, not become the indication to the JOG mode even it the search dial is pressed. 3-11 SRW-5000/5500...
Page 106
LCD TEST from the center. Press F5 key to test LCD. (The arrow does not change from the previous direction for the center position.) BEEP MFD click: When turning the MULTI CON- EXIT DIAG TROL knob, “ON” is displayed. 3-12 SRW-5000/5500...
Page 107
Check count : 1/87 BEEP EXIT DIAG 3. To cancel or exit the check, press the [F10] (EXIT) key while pressing the [SFT] (SHIFT) key. . The test menu is closed, and the menu returns to the PANEL CHECK menu. 3-13 SRW-5000/5500...
Page 108
An LED that is not extinguished is abnormal. DIAL PANEL MAINTENANCE MENU LED TEST All LEDs should OFF. LED which turns on does not work normally. Press F8 key to test each LED. Press F10 key to exit. BEEP EXIT DIAG 3-14 SRW-5000/5500...
Performs the function check for the T reel motor. [F7] (THREAD MOTOR) Key Performs the function checks for the threading motor and the threading end sensor/unthreading end sensor. [F8] (CCM MOTOR) Key Performs the function checks for the cassette compartment motor and the cassette down sensor. 3-15 SRW-5000/5500...
Page 110
. Check the corresponding sensor input port of MPU (IC100 on the DR-508 board). 1 : ID-1 2 : ID-2 3 : ID-3 4 : ID-4 5 : ID-5 6 : ID-6 D L cassette REC inhibit switch Sensor B S cassette REC inhibit switch Sensor Locations of Sensors (Switches) 3-16 SRW-5000/5500...
Page 111
Push the cassette window up manually. Push the switch in the direction of thick arrow. Locations of Switches in Cassette Compartment < Top view > Rear Cassette compartment PC-70 board Front Cassette-in sensor (L) Cassette size sensor Cassette-in sensor (R) Locations of Sensors 3-17 SRW-5000/5500...
Page 112
Actually, draw out the SS-95 board with the EX-873 extension board and check TP B-21 (for END sensor) and TP A-120 (for TOP sensor) on the extension board. Tape top sensor Tape end sensor Locations of Tape Top/End Sensors 3-18 SRW-5000/5500...
Page 113
In case of NG . Check each sensor itself. . Check the detection circuit on the DR-508 board. . Check the sensor input port of MPU (IC206 on the DR-508 board). Dew (condensation) sensor Location of Dew (Condensation) Sensor 3-19 SRW-5000/5500...
Page 114
. Execute the [F3] (S REEL FG) or [F4] (T REEL FG) of the SERVO ADJUST menu. (Refer to Section 3-4-2.) . Check the FG output from a reel table FG sensor. . Check the reel FG shaping circuit on the SS-95 board. 3-20 SRW-5000/5500...
Page 115
[F10] (EXIT) key. 6. Press the [F10] (EXIT) key while pressing the [SFT] (SHIFT) key. 7. Press the [F10] (EXIT) key after the message “Check Complete” is displayed to return to the SERVO CHECK menu. 3-21 SRW-5000/5500...
Page 116
. Check the threading end sensor or unthreading end sensor on the TR-120 board. . Check the sensor input port of MPU (IC801 on the SS-95 board). Unthreading end sensor Threading motor Threading end sensor Threading ring Locations of Threading End and Unthreading End Sensors 3-22 SRW-5000/5500...
Page 117
6. Press the [F10] (EXIT) key while pressing the [SFT] (SHIFT) key. SERVO CHECK MENU 7. Press the [F10] (EXIT) key after the message “Check Complete” is displayed to PUSH SET(FOR DOWN) return to the SERVO CHECK menu. DOWN 3-23 SRW-5000/5500...
Page 118
. Check the cassette compartment motor driver circuit on the DR-508 board. . Check the cassette compartment motor. . Check the sensor input port of MPU (IC100 on the DR-508 board). Rear Upper Cassette-down sensor (1) Lower Cassette-down sensor (2) Cassette compartment motor Front Top View of Cassette Compartment 3-24 SRW-5000/5500...
Page 119
. Check the capstan FG shaping circuit on the SS-95 board. . Check each circuit that processes the capstan FG on the SS-95 board. . Check the capstan motor. Capstan shaft (Unthreading end state) Location of Capstan Shaft 3-25 SRW-5000/5500...
Page 120
Performs the checks for the duty ratio of the S reel FG/T reel FG/capstan FG, the offset/friction level of the S reel/T reel, and the torque of the S reel/T reel. [F10] (EXIT) Key Exits the ALT SERVO CHECK menu and returns to the MAINTENANCE menu. 3-26 SRW-5000/5500...
Page 121
. Check the FG and PG outputs from the drum motor. PHASE : LOCK . Check the drum FG/PG shaping circuit on the DR-508 board. . Check each circuit that processes the drum FG/PG on the SS-95 board. 3-27 SRW-5000/5500...
Page 122
. Check the sensor input port of MPU (IC100 on the DR-508 board). S reel table T reel table Reel shift motor (S cassette position state) L position sensor S position sensor Locations of S and L Position Sensors and Reel Shift Motor 3-28 SRW-5000/5500...
Page 123
. Check the mechanical abnormality. . Check the pinch roller solenoid driver circuit on the DR-508 board. . Check the pinch roller solenoid itself. Pinch roller solenoid Pinch lever Capstan (Unthreading end state) Locations of Pinch Roller Solenoid and Pinch Lever 3-29 SRW-5000/5500...
Page 124
. Check the reel brake solenoid driver circuit on the DR-508 board. . Check the reel brake solenoid itself. S reel table T reel table (S cassette position state) S reel brake solenoid T reel brake solenoid Locations of Reel Brake Solenoids 3-30 SRW-5000/5500...
Page 125
. Check the mechanical abnormality. . Check the cleaning roller solenoid driver circuit on the DR-508 board. . Check the cleaning roller solenoid itself. Cleaning roller Cleaning roller solenoid (Unthreading end state) Locations of Cleaning Roller and Cleaning Roller Solenoid 3-31 SRW-5000/5500...
Page 126
4. To finish the check, press the [F10] (EXIT) key. 5. Press the [F10] (EXIT) key while pressing the [SFT] (SHIFT) key. 6. Press the [F10] (EXIT) key after the message “Check Complete” is displayed to return to the ALT SERVO CHECK menu. 3-32 SRW-5000/5500...
HDCAM SR format playback. [F2] (HDCAM DT) Key Performs the operation checks of the DT heads for the HDCAM and Digital BETACAM format playback. [F10] (EXIT) Key Exits the DT/SAT CHECK menu and returns to the MAINTENANCE menu. 3-33 SRW-5000/5500...
Page 128
1. Check the bimorph driving circuit on the DT-47 board. 2. DT gain Auto Adjust Complete 2. Check the bimorph driving control circuit on the SS-95 board. CH1: 478 CH2: 455 3. Check the signal transmission system (slip ring etc.). 3-34 SRW-5000/5500...
Page 129
2. DT gain Auto Adjust Complete 1. Check the bimorph driving circuit on the DT-47 board. CH1: 416 CH2: 417 2. Check the bimorph driving control circuit on the SS-95 board. 3. Check the signal transmission system (slip ring etc.). 3-35 SRW-5000/5500...
[F3] (AUDIO TST SG) Key Select a signal to be generated from the built-in audio test signal generator of this unit. [F10] (EXIT) Key Exits the SERVO CHECK menu and returns to the MAIN- TENANCE menu. 3-36 SRW-5000/5500...
Page 131
SD OUTPUT CHECK TEST VIDEO DCP TEST : OFF TST SG RAMP VIDEO TEST SG : OFF COLOR BARS BLACK AUDIO TEST SG : OFF AUDIO MULTI BURST WHITE(100%) TST SG 10 STEPS PATHOLOGICAL PULSE & BAR EXIT DIAG 3-37 SRW-5000/5500...
ALT + [F1] (TRKING TMRHLD) Key Sets the holding time of the tracking timer. This function is factory use only. Never use this function. [F10] (EXIT) Key Exits the RF CHECK menu and returns to the MAINTE- NANCE menu. 3-38 SRW-5000/5500...
Page 134
Advance head H1 Advance head A2 Advance head B2 Advance head C2 Advance head D2 Advance head E2 Advance head F2 Advance head G2 Advance head H2 Advance head A HDCAM Advance head B Advance head C Advance head D 3-40 SRW-5000/5500...
Page 136
7. Press the [F10] (EXIT) key to exit the RF CHECK menu. . To check another channel or mode in the same format, return to step 2. . To perform a check in another format, press the [F10] (EXIT) key once to retrun to step 1. 3-42 SRW-5000/5500...
Page 137
8 Replace the drum assembly if required. . In the tape transport system, adjustment defect or component part installation defect 8 Readjust the tape transport system or reinstall the part. . EQ-94 board defect . Drum assembly defect 3-43 SRW-5000/5500...
Page 138
(10)Clean the drum (rotary heads) with a cleaning cloth referring to Sections 4-2-2 and 4-2-3. Recheck in the [F3] (REC CH CHK) after re-recording any video signal on the tape for two minutes or more. When no abnormality is found, the check is completed. 3-44 SRW-5000/5500...
Select a test signal to be generated from the built-in audio test signal generator of this unit. [F5] (TG STATUS) Key Displays the status of the time code generator built in this unit. [F10] (EXIT) Key Exits the AUDIO/VIDEO CHECK menu and returns to the MAINTENANCE menu. 3-45 SRW-5000/5500...
Page 140
SYSTEM EE : BYPASS EE TST SG PLUSE & BAR VIDEO TEST SG : OFF COLOR BARS RAMP AUDIO TEST SG : OFF MULTI BURST(1) BLACK MULTI BURST(2) PATHOLOGI(1) 10 STEPS PATHOLOGI(2) AUDIO TST SG EXIT DIAG STATUS 3-46 SRW-5000/5500...
Page 141
CK74MHz : LOCK To display the status of the HD system reference signal, press the [F8] (HD REF) key. EXIT DIAG INFO. INPUT TIMING GENERATOR STATUS HD REF INFO. HD H-SYNC EXIST : EXIST EXIT DIAG INFO. INPUT 3-47 SRW-5000/5500...
50-pin parallel remote interface. Also displays the logic level of the input pin. [F7] (PARA-O SETUP) Key Changes the setup data (function settings for input pins) of the 50-pin parallel remote interface. Also displays the logic level of the input pin. 3-48 SRW-5000/5500...
Page 143
2. In the Tele-File CHECK menu, press the [F3] (READ TEST) key. . The check details are displayed. Pressing the [F8] (RESET) key returns all the values to “0”. TOTAL: Reading check counts PASS: OK counts for reading checks FAIL: NG counts for reading checks 3-49 SRW-5000/5500...
Page 144
6. Press the [F10] (EXIT) key to return to the NET- CANCEL SAVE EXIT DIAG WORK SETUP menu. Unless NETWORK SETUP is completed, settings for each SNMP are disabled. When setting SNMP following NETWORK SETUP, power OFF and ON the unit. 3-50 SRW-5000/5500...
Page 145
When an IP address is set for the [F1] (READ ONLY) or [F2] (READ WRITE) key, an SNMP trap is sent to the IP address. When it is necessary to send an IP trap to another ID address, set IP addresses of the [F4] to [F6] keys. 3-51 SRW-5000/5500...
Page 146
. The confirmed text is displayed. 5. Press the [F10] (SAVE/EXIT) key again to return to . The confirmed text is displayed. 5. Press the [F10] (SAVE/EXIT) key again to return to the NETWORK SETUP menu. the NETWORK SETUP menu. 3-52 SRW-5000/5500...
Page 147
NVRAM METER HEAD ROOM M-HEAD AUD LVL MTR : _20dB ROOM _20dB _18dB _16dB _15dB _12dB EXIT DIAG 3. Press the [F1] (NVRAM CTL) key. OTHERS CHECK NVRAM CONTROL NO OPERATION SAVE ALL DATA EXIT DIAG 3-53 SRW-5000/5500...
Page 148
3. Press the [F7] (CLEAR) key while pressing the 34:H 20 01 00 00 00 00 00 MEMORY EXIT [SFT] (SHIFT) key to reset the value being displayed. DIAG CARD 4. Press the [F10] (EXIT) key to return to the NET- WORK SETUP menu. 3-54 SRW-5000/5500...
Page 149
SETUP menu. PARA-I SETUP or PARA-O SETUP is made. To return NV-RAM to the factory-setting data, select “ALL DATA PREVIOUS”, and press the [F10] (EXIT) key. 6. Press the [F10] (EXIT) key to return to the OTHERS CHECK menu. 3-55 SRW-5000/5500...
Page 150
[F8] (LCD GAIN) Key [F9] (SYSTEM MENU) Key (SRW-5000) Performs the gain adjustment of the color display. Sets the operation mode of this unit. Execution Procedure The selectable systems differ according to the VTR 1. On the OTHERS CHECK menu, press the [F8] (LCD settings or option boards.
Page 151
29.97Hz [F4]SYSTEM SIGNAL MODE 422 29.97Hz SYSTEM FREQ 30Hz [F6]FRAME CONVERT 1080/59.94i 50Hz [F7]ACTIVE LINE 1080 SYSTEM 59.94Hz [F8]CANCEL [F9]Exec of Reset VTR Sys SIGNAL 60Hz (STOP & STANDBY OFF/EJECT) FRAME ACTIVE CANCEL EXEC EXIT DIAG CNVERT LINE 3-57 SRW-5000/5500...
Page 152
F9 F10 [F8]CANCEL [F9]Exec of Reset VTR Sys SIGNAL (STOP & STANDBY OFF/EJECT) FRAME ACTIVE CANCEL EXEC EXIT DIAG CNVERT LINE 11. Check that the system is restarted, and turn OFF the POWER switch and turn ON again. 3-58 SRW-5000/5500...
Page 153
[F4]SYSTEM SIGNAL MODE 422 29.97Hz SYSTEM FREQ 30Hz [F6]FRAME CONVERT 1080/59.94i 50Hz [F7]ACTIVE LINE 1080 SYSTEM 59.94Hz [F8]CANCEL [F9]Exec of Reset VTR Sys SIGNAL 60Hz (STOP & STANDBY OFF/EJECT) FRAME ACTIVE CANCEL EXEC EXIT DIAG FORMAT CNVERT LINE F9 F10 3-59 SRW-5000/5500...
Page 154
O r p r e s s [ F 8 ] t o C A N C E L . [F7]ACTIVE LINE 1080 SYSTEM [F8]CANCEL [F9]Exec of Reset VTR Sys SIGNAL (STOP & STANDBY OFF/EJECT) FRAME ACTIVE CANCEL EXEC EXIT DIAG FORMAT CNVERT LINE 3-60 SRW-5000/5500...
Page 155
[F2] (HDCAM-SR) [F2] ALT + [F1] (META DATA) Key on SRW-5500 . In SRW-5000, the meta data line setting menu appears. The setting procedure of SRW-5500 is the same as that of Perform “M-DATA LINE Setting”. SRW-5000. . In SRW-5500, the format selection menu appears.
Page 156
LINE1, LINE2 (D): Line number (decimal) DID (H): Data ID (hexadecimal) SDID (H): Secondary data ID (hexadecimal) 3. Press the [F1] (NVRAM CTL) key. OTHERS CHECK NVRAM CONTROL NO OPERATION SAVE ALL DATA ALL DATA PREVIOUS RESET ALL DATA EXIT DIAG 3-62 SRW-5000/5500...
Page 157
Records in the same phase as reference. +1FRAME: Records with one-frame delay of refer- ence. [F6] (TC INPUT) key Performs phase setting for record time code input. OFF: Records in the same phase as reference. +1FRAME: Records with one-frame delay of refer- ence. 3-63 SRW-5000/5500...
Currently not available [F9] (VTR LOG) Key Currently not available [F10] (EXIT) Key Exits the ALT MAINTENANCE menu and returns to the MAINTENANCE menu. ALT + [F2] (PHASE SET) key Performs phase settings for various inputs and outputs. 3-64 SRW-5000/5500...
[F7] (T REEL O/F) Key the menu returns to the SERVO ADJUST menu. Performs the T reel offset/friction adjustment. [F8] (S REEL TORQUE) Key Performs the S reel torque adjustment. [F9] (T REEL TORQUE) Key Performs the T reel torque adjustment. 3-65 SRW-5000/5500...
Page 160
. When the adjustments are completed normally, the message “Auto Adjust Auto Adjust Complete Complete” is displayed. 5. To save the adjusted data, press the [F1] (NVRAM CTL) key to display the NV-RAM CONTROL menu, and execute “SAVE ALL DATA”. 3-66 SRW-5000/5500...
Page 161
T REEL T REEL OFFSET/FRICTION AUTO CAPSTN S REEL T REEL T REEL S REEL EXIT Press SET key. DIAG TORQUE TORQUE S REEL T REEL CAPSTN S REEL T REEL T REEL S REEL EXIT DIAG TORQUE TORQUE 3-67 SRW-5000/5500...
Page 162
[F9] (T REEL TORQUE) Key Performs the T reel torque adjustment. NVRAM SERVO ADJUST T REEL TORQUE AUTO Press SET key. S REEL T REEL CAPSTN S REEL T REEL S REEL T REEL EXIT DIAG TORQUE TORQUE 3-68 SRW-5000/5500...
Page 163
If “Auto Adjust Failure” is displayed, refer to “For Automatic Adjustment SERVO ADJUST S REEL FG DUTY Failure” on page 3-75. Auto Adjust Complete 4. To save the adjusted data, press the [F1] (NVRAM CTL) key to display the NV-RAM CONTROL menu, and execute “SAVE ALL DATA”. 3-69 SRW-5000/5500...
Page 164
. When the saving of the adjusted data is completed, Performs the RF switching position adjustment in HDCAM format. the menu returns to the ALT SERVO ADJUST menu. [F10] (EXIT) Key Exits the ALT SERVO ADJUST menu and returns to the ALT MAINTENANCE menu. 3-70 SRW-5000/5500...
Page 165
[F3] (T REEL GAIN) Key Performs the T reel QPL gain adjustment. NVRAM ALT SERVO ADJUST T REEL QPL GAIN CAPSTN GAIN Press SET key. T REEL GAIN TENSN OFFSET RF SW RF SW EXIT DIAG POS SR POS HD SRW-5500 3-71 SRW-5000/5500...
Page 166
If “Auto Adjust Failure” is displayed, refer to “For Automatic Adjustment Failure”on page 3-75. ALT SERVO ADJUST CAPSTAN QPL GAIN Auto Adjust Complete 4. To save the adjusted data, press the [F1] (NVRAM CTL) key to display the NV-RAM CONTROL menu, and execute “SAVE ALL DATA”. SRW-5500 3-72 SRW-5000/5500...
Page 167
Failure” on page 3-75. 5. To save the adjusted data, press the [F1] (NVRAM CTL) key to display the ALT SERVO ADJUST RF SWITCHING POS. NV-RAM CONTROL menu, and execute “SAVE ALL DATA”. Auto Adjust Complete PG : 2514 SRW-5500 3-73 SRW-5000/5500...
Page 168
Failure” on page 3-75. 5. To save the adjusted data, press the [F1] (NVRAM CTL) key to display the ALT SERVO ADJUST RF SWITCHING POS. NV-RAM CONTROL menu, and execute “SAVE ALL DATA”. Auto Adjust Complete PG : 2514 3-74 SRW-5000/5500...
Page 169
[F6] (S REEL O/F) [F8] (S REEL TORQUE) When “# S REEL TROUBLE #” is displayed: 8 Execute the S reel FG duty adjustment: [F3] (S REEL FG) again. 8 Check the S reel motor driver circuit on the DR-508 board. 3-75 SRW-5000/5500...
Performs the automatic adjustment of the SAT signal playback gain in HDCAM format. [F7] (HDSR DT MES) Key Measures RF envelope of the HDCAM SR format DT head. [F10] (EXIT) Key Exits the DT/SAT ADJUST menu and returns to the ALT MAINTENANCE menu. 3-76 SRW-5000/5500...
Page 171
SAVE ALL DATA: Saves the adjusted data on the NV-RAM. Normally select this operation. 3. Press the [F10] (EXIT) key to save the adjusted data to the NV-RAM. . When the saving of the adjusted data is completed, the menu returns to the DT/SAT ADJUST menu. 3-77 SRW-5000/5500...
Page 172
Check that the RF ENVELOPE signal passes through TP1310/1311 on the SS- 95 board. . If it does not: Check the EQ-94 board. . If it does: Check the SS-95 board. 4. If the DT gain adjustment failed Check the SS-95 and DT-47 boards. 3-78 SRW-5000/5500...
Page 173
Check that the RF ENVELOPE signal passes through the test point TP1310/ 1311 on the SS-95 board. . If it does not: Check the EQ-94 board. . If it does: Check the SS-95 board. 4. If the DT gain adjustment failed Check the SS-95 and DT-47 boards. 3-79 SRW-5000/5500...
Page 174
3. Play back the alignment tape, and check that the SAT envelope signal passes through TP1001/1003 on the SS-95 board. . If it does not: Check the EQ-94 board. . If it does: Check if the alignment tape is abnormal (recording error or CTL variation). 3-80 SRW-5000/5500...
Page 175
3. Play back the alignment tape, and check that the SAT envelope signal passes through TP1001/1003 on the SS-95 board. . If it does not: Check the EQ-94 board. . If it does: Check if the alignment tape is abnormal (recording error or CTL variation). 3-81 SRW-5000/5500...
Page 176
2. Check that the switches S802-1 to 8 are all OFF on the SS-95 board, referring to Section 1-14. If not, set all the switches to OFF, and perform the measurement again. If normal, the measurements are completed. 3-82 SRW-5000/5500...
LEVEL) key several times to change the setting. OFF: Normal state Outputs the COLOR BARS test signal. The test signal can be recorded on a tape. SD OUTPUT ADJUST VIDEO SDI PLL : OFF LEVEL VIDEO LEVEL : OFF EXIT DIAG 3-83 SRW-5000/5500...
[F7] (FWD PLL ADJ) Key Adjusts the VCO free-running frequency of the playback PLL circuit for the FWD mode. [F8] (REV PLL ADJ) Key Adjusts the VCO free-running frequency of the playback PLL circuit for the REV mode. 3-84 SRW-5000/5500...
Page 179
When a cassette tape has been inserted, eject it before selecting a format. 2. Press the [F2] (RF ALL ADJ) key to display the RF ALL ADJUST menu. NVRAM RF ADJUST All Adjust [HDCAM-SR] Set HR5-1B alignment tape. LIST EXIT DIAG 3-85 SRW-5000/5500...
Page 180
Menu Upper level: Normal adjustment time Lower level: Tape amount required (Transport mode) RF ALL ADJUST About 20 seconds/ALL Adjustment time (PLAY) NVRAM RF ADJUST All Adjust [HDCAM-SR] Press SET key. LIST EXIT DIAG 3-86 SRW-5000/5500...
Page 181
“OK” or “NG” is displayed as an adjustment result and the adjustment is completed to the [F8] : REV PLL ADJ. When the HDCAM SR format is selcted in SRW-5000, the message “Continue REC CURRENT?” is displayed. When the HDCAM SR or HDCAM format is selcted in SRW-5500, the message “Continue REC CURRENT?”...
Page 182
Advance head D2 Advance head E2 Advance head F2 Advance head G2 Advance head H2 Confidence head A HDCAM Confidence head B Confidence head C Confidence head D Advance head A Advance head B Advance head C Advance head D 3-88 SRW-5000/5500...
Page 183
Menu Upper level: Normal adjustment time Lower level: Tape amount required (Transport mode) REC ADJUST About 10 seconds/ALL Adjustment time (REC) 3-89 SRW-5000/5500...
Page 184
When the adjusted data is not to be saved, select “NO OPERATION”, and press the [F10] (EXIT) key. . When the saving of the adjusted data is completed, the message “Save Complete” is displayed and returns to the RF ALL ADJUST menu. 10. Eject the tape. 3-90 SRW-5000/5500...
Page 185
[NG List : Total 0] : Advance A1 : OK LIST EXIT DIAG 14. To save the adjusted data, perform the above steps 8 to 10. If the adjustment result has an NG, do not save the adjusted data on the NV-RAM. 3-91 SRW-5000/5500...
Page 186
Adjusts the VCO free-running frequency of the playback PLL circuit for the FWD mode. ALL CH EXIT DIAG NVRAM RF ADJUST FWD PLL [HDCAM-SR] To adjust all channels, press F6 key. To select the channel, press F7 key. ALL CH EXIT DIAG 3-92 SRW-5000/5500...
Page 187
Set HR5-1B alignment tape. ALL CH EXIT DIAG [F9] (AD GAIN) Key Adjusts the gain for the A/D conversion of the playback RF signal. NVRAM RF ADJUST REV PLL [HDCAM-SR] Set HR5-1B alignment tape. ALL CH EXIT DIAG 3-93 SRW-5000/5500...
Page 188
When a cassette tape has been inserted, eject it before selecting a format. 2. Press the [F3] (VCA ADJ) key to display the VCA ADJUST menu. NVRAM RF ADJUST [HDCAM-SR] Set HR5-1B alignment tape. ALL CH EXIT DIAG 3-94 SRW-5000/5500...
Page 189
Adjustment time (REV) AD GAIN ADJUST About 10 min./ALL, about 25 sec./channel Adjustment time (PLAY) NVRAM HDCAM-SR FORMAT RF ADJUST [HDCAM-SR] To adjust all channels, press F6 key. To select the channel, press F7 key. ALL CH EXIT DIAG 3-95 SRW-5000/5500...
Page 190
Advance head D2 Advance head E2 Advance head F2 Advance head G2 Advance head H2 Confidence head A HDCAM Confidence head B Confidence head C Confidence head D Advance head A Advance head B Advance head C Advance head D 3-96 SRW-5000/5500...
Page 191
DIAG (2) Press the [F10] (EXIT) key while pressing the [SFT] (SHIFT) key, and then press the [F10] (EXIT) key again to return to the VCA ADJUST menu. To continue the adjustment, press the [F10] (EXIT) key only. 3-97 SRW-5000/5500...
Page 192
When the adjusted data is not to be saved, select “NO OPERATION”, and press the [F10] (EXIT) key. . When the saving of the adjusted data is completed, the message “Save Complete” is displayed and returns to the VCA ADJUST menu. 10. Eject the tape. 3-98 SRW-5000/5500...
Page 193
8 Replace the drum assembly as required. . In the tape transport system adjustment defect or compo- nent part installation defect 8 Readjust the tape transport system or reinstall the part. . EQ-94 board defect . Drum assembly defect 3-99 SRW-5000/5500...
The numbers in the illustration correspond to the table in the next page. 2Cleaning roller 2Video head cleaner assembly 7Pinch press assembly 1Drum assembly 5Pinch roller assembly 5S reel motor assembly 6T reel motor assembly 8Fan motors (plug-in board) 9Power supply unit 0Fan motor (MD) 0Fan motor (MD) SRW-5000/5500...
1. Press the DIAG button while pressing the [SFT] (SHIFT) key in the HOME menu to display the MAINTENANCE INFORMATION menu. . The hours meter will be displayed on the color display. 2. To exit the MAINTENANCE INFORMATION menu, press the [F10] (EXIT) key. SRW-5000/5500...
2. Preparation 1. Turn the power off. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 4. Open the AE-31 board. (Refer to a figure in Section 5-1-2.) SRW-5000/5500...
Page 200
Full-erase head/CTL head AT head/AT erase head TG-3 TG-7 Rotary heads TG-0 Tape cleaner TG-8 Upper drum TG-1 Cassette support Cassette support TG-6 TG-10 Pinch roller Lower drum TG-5 Cassette support Slant guide Cassette support Cassette compartment Compartment block SRW-5000/5500...
. Pay careful attention when cleaning the bottom edge of the upper drum. . Also, careful for the flexible card wire of the brush slip ring assembly. 3. After cleaning, wipe them using a dry cleaning cloth two or three times. Tape-running surface Video Heads Cleaning SRW-5000/5500...
3. After cleaning, wipe them using a dry cleaning cloth two or three times. Lower drum's tape-running surface Drum lead surface Skewer Drum lead surface Cleaning cloth Lower drum's tape-running surface Tape-running Surface of Lower Drum and Lead Surface Cleaning SRW-5000/5500...
AT, AT erase, CTL, and full-erase heads. 2. After cleaning, wipe them using a dry cleaning cloth two or three times. AT head assembly Cleaning AT head AT erase head CTL/FE head assembly Cleaning Full-erase head CTL head Stationary Heads Cleaning 4-10 SRW-5000/5500...
3. After cleaning, clean them using a dry cleaning cloth two or three times. Capstan TG-4 TG-3 (Exit guide) TG-9 TG-8(T-TEN) TG-7 TG-10 TG-0 Slant guide Tape cleaner TG-2 TG-5 (Entrance guide) TG-1 (S-TEN) TG-6 Pinch roller (Threading end mode) Tape-running System and Tape Cleaner Cleaning 4-11 SRW-5000/5500...
4. Clean the four cassette supports on the mechanical deck using a dry cloth (or gauze). 5. Reattach the cassette compartment. (Refer to Section 1-5.) Cassette compartment assembly Cassette support Cassette support Compartment block Cassette support Cassette support Cassette Compartment Cleaning 4-12 SRW-5000/5500...
Pinch Roller Gear Box Assembly/Threading Motor 5-17 Pinch Press Assembly Threading Ring Assembly 5-18 Capstan Motor 5-10 S Tension Regulator Assembly 5-19 Reel Table Assembly 5-11 T Tension Regulator Assembly 5-20 Brake Assembly (S) 5-12 T Drawer Assembly 5-21 SRW-5000/5500...
Page 208
Part name Section Part name Section Fan Motor (Plug-in Boards) 5-23-1 Lamp Unit 5-26-2 Fan Motor (MD) 5-23-2 Organic EL Indicator Module 5-27 Power Supply Unit 5-24 Inverter Unit 5-28 Dial Assembly 5-25 PC Card Adaptor 5-29 LCD Unit 5-26-1 SRW-5000/5500...
Page 209
Section 5-30-17 Section 1-25-24 PC-70 Section 1-5 (Replace by the Section 1-25-25 Cassette Compartment Assembly.) PTC-101 Refer to Section 5-25 Section 1-25-26 (Replace by the Search Dial Assembly.) PTC-102 Section 5-17 (Replace by the Section 1-25-27 Gear Box Assembly.) SRW-5000/5500...
AT head TG-3 (Exit guide) TG-8 (T tension regulator) M gear TG-9 TG-6 TG-4 Capstan Pinch roller TG-5 (Threading roller) TG-1 (S tension regulator) TG-0 Full erase head TG-2 TG-10 Slant guide Tape cleaner CTL head Threading End Mode SRW-5000/5500...
Page 211
M gear AT head TG-3 (Exit guide) TG-8 (T tension regulator) TG-7 TG-4 Capstan Full erase head TG-0 Tape cleaner CTL head TG-2 TG-6 Slant guide TG-10 TG-1 (S tension regulator) Pinch roller TG-5 (Threading roller) Unthreading End Mode SRW-5000/5500...
C until it stops lightly by fingers. Be careful not to turn the gear excessively. Or the gear locks and the reel shift operation can not be made. S1002 SS-95 board S reel table T reel table Gear L Cassette Position SRW-5000/5500...
Page 213
D until it stops lightly by fingers. Be careful not to turn the gear excessively. Or the gear locks and the reel shift operation can not be made. S1002 SS-95 board S reel table T reel table Gear S Cassette Position SRW-5000/5500...
Oil (5 mm in depth) 4. Stop Washer and E Ring It should not be used the stop washer and E ring once again. It is recommended checking a required stop washer and E ring before replacement, and preparing more than required number. SRW-5000/5500...
Page 216
CN220 on the DT-47 board. Flexible board (5) Pull out the EQ-94 board and set the board EQ-94 board onto the other plug-in boards without discon- necting the harnesses from the EQ-94 board. (Refer to Section 1-12.) 5-10 SRW-5000/5500...
Page 217
AT head or peripheral tape guides. Send down the drum harnesses . Becareful not to touch the disconnected Drum harnesses into the reverse-side harness to the AT head or peripheral tape side of the mechanical deck. guides. Remove the Drum Assembly 5-11 SRW-5000/5500...
Page 219
AT head or peripheral tape guides at that time. Drum harness(30P) . Be careful not to put the harnesses between the drum motor portion and the MD base Positioning pins assembly. (3) Confirm that the drum assembly is firmly inserted into the positioning pins. 5-13 SRW-5000/5500...
Page 220
(Refer to Sections 4-2-3 and 4-2-4.) (2) Lower drum’s tape running surface and lead surface (Refer to Section 4-2-5.) C3 x 8 After cleaning, wipe with a dry cleaning cloth. CN220 Edge holder DT-47board Flexible board Attach the Drum Assembly 5-14 SRW-5000/5500...
Page 221
[F1] (DRUM MOTOR) of the ALT SERVO CHECK menu 8. Adjusting the Tape Running Refer to Sections 6-2 to 6-11. 9. Confirming the Tape Running Refer to Section 6-12. 10. Electrical Adjustment after Replacing the Drum Refer to Section 7-2. 5-15 SRW-5000/5500...
(3) Turn the brush slip ring assembly upside DT-47 board down, and take out the two screws. Use care not to fall the screws into the cover of the brush slip ring assembly. CN220 Remove the Brush Slip Ring Assembly 5-16 SRW-5000/5500...
Page 223
Never apply excessive force to the cover. (4) Connect the flexible board into the connector CN220 on the DT-47 board, then lock. CN220 Tightening torque : 14.7 x 10 N.m {1.5 kgf.cm} Attach the Brush Slip Ring Assembly 5-17 SRW-5000/5500...
Preparation 1. Turn off the power. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 4. Open the AE-31H board. (Refer to the figure in Section 5-1-2.) 5-18 SRW-5000/5500...
Page 225
At this time, confirm that there is no vertical play. Do not reverse the direction of the cleaning roller. Narrow (white) The height between the cleaing roller and head is shifted in this case. Cleaning roller Wide (gray) CR spacer Replace the Cleaning Roller 5-19 SRW-5000/5500...
Page 226
A (counterclockwise). (4) Fill in the hours of the cleaning roller re- placement on the hours label sticked on the video head cleaner assembly. Full-erase head Attach the Video Head Cleaner Assembly 5-20 SRW-5000/5500...
Page 227
(Specification 3) A = Clearance exists. Spec 1 : B = Clearance exists. Spec 2 : Ratchet bracket Iron core Arm plate assembly Spec 3 : C = Clearance exists. Adjust the Cleaning Roller Position 5-21 SRW-5000/5500...
Page 228
(or equivalent). Viddeo head cleaner assembly Harness Clamper Full-erase head Connect the Harness Adjustment after Replacement 7. Confirm the Cleaning Solenoid Operation Refer to Section 3-3-4. [F6] (CLEAN PLG) of the ALT SERVO CHECK menu 5-22 SRW-5000/5500...
1. Turn the power off and disconnect the power cord. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 4. Open the AE-31H board. (Refer to the figure in Section 5-1-2.) 5-23 SRW-5000/5500...
Page 230
(2) Fix the CL arm assembly by a new stop Spring washer. Stop washer (2.3): 3-669-596-00 Remove/Attach the CL Arm Assembly Be careful not to touch the tools to the drum or peripheral tape guides when attaching the stop washer. 5-24 SRW-5000/5500...
Page 231
. The cleaning roller cleans the CTL/TC head and capstan motor shaft. AT head CL arm assembly M gear CL guide rail Confirm the CL Arm Assembly Operation 4. Confirming the Threading Operation Refer to Section 3-3-4. [F7] (THREAD MOTOR) of the SERVO CHECK menu 5-25 SRW-5000/5500...
. Torque screwdriver’s bit (+2 mm, l = 75 mm): J-6323-420-A Preparation 1. Turn the power off and disconnect the power code. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 5-26 SRW-5000/5500...
Page 233
4. Adjusting the Tape Running Refer to Sections 6-2 to 6-11. 5. Confirming the Tape Running Refer to Section 6-12. 6. Adjusting the Drum Phase Refer to Section 7-2-3. 7. Full Erasure Current Check Refer to Section 8-8-4. 5-27 SRW-5000/5500...
. Torque screwdriver’s bit (+2 mm, l = 75 mm): J-6323-420-A Preparation 1. Turn the power off and disconnect the power cord. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 5-28 SRW-5000/5500...
Page 235
. Be careful not to damage the AT head surface. Remove/Attach the AT Head Assembly (3) Align the bosses of the chassis in the center of slotted holes and tighten with the two screws. (4) Connect the harness to the connector of the AT head assembly. 5-29 SRW-5000/5500...
Page 236
After cleaning, wipe with a dry cleaning cloth. Reattach the CL Guide Rail Adjustment after Replacement 6. Adjusting the Tape Running Refer to Sections 6-2 to 6-11. 7. Electrical Adjustment after Replacing the AT Head Refer to Section 7-3. 5-30 SRW-5000/5500...
. Cleaning cloth: 3-184-527-01 . Cleaning fluid: 9-919-573-01 Preparation 1. Turn the power off and disconnect the power cord. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 5-31 SRW-5000/5500...
Page 238
(3) Fix the pinch arm assembly by a new stop washer. Stop washer (2.3): 3-660-596-00 Be careful not to touch the tools to the peripheral tape guides when attaching the stop washer. 5-32 SRW-5000/5500...
Page 239
Be sure to perform the confirmation after fixing the pinch arm assembly by the new stop washer. 4. Cleaning Clean the pinch roller and TG-5 guide surfaces with a cleaning cloth moistened with cleaning fluid. (Refer to Section 4-2-6.) 5-33 SRW-5000/5500...
Page 240
[F3] (PINCH PLG) of the ALT SERVO CHECK menu 7. Adjusting the Tape Running at Drum Exit Side Press arm (B) Refer to Section 6-12-2. Iron core Press arm (A) Spec : A = Clearance exists Confirm the Pinch Press Clearance 5-34 SRW-5000/5500...
1. Turn the power off and disconnect the power cord. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 4. Open the AE-31H board. (Refer to the figure in Section 5-1-2.) 5-35 SRW-5000/5500...
Page 242
(1) Reconnect the harnesses to the four connec- tors CN216, CN231 and CN233 on the HN- 268 board. (2) Fix the harnesses with the bundling band (or Remove/Attach the Pinch Press Assembly an equivalent) avoiding contact to the drive portion of the gearbox assembly. 5-36 SRW-5000/5500...
Page 243
Confirm the Pinch Press Clearance Adjustment after Replacement 6. Confirming the Pinch Roller Solenoid Operation Refer to Section 3-3-4. [F3] (PINCH PLG) of the ALT SERVO CHECK menu 7. Adjusting the Tape Running at Drum Exit Side Refer to Section 6-12-2. 5-37 SRW-5000/5500...
1. Turn the power off and disconnect the power cord. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 4. Open the AE-31H board. (Refer to the figure in Section 5-1-2.) 5-38 SRW-5000/5500...
Page 245
These screws should not be removed neces- sarily. (4) Open the DR-508 board in the arrow direc- tion. DR-508 board Open the board slowly so that excessive force is not applied to the connected harnesses. Open the DR-508 Board 5-39 SRW-5000/5500...
Page 246
(2) Tighten the two screws while holding the capstan motor by hand. Capstan motor Tightening torque: 78.4 x 10 {8.0 kgf.cm} (3) Reconnect the harness disconnected in (1) of step 3 to the connector of the capstan motor. Harness Remove/Attach the Capstan Motor 5-40 SRW-5000/5500...
Page 247
(Refer to Section 1-3-2.) (7) Restore the unit to the original position. 6. Cleaning Clean the capstan motor shaft with a cleaning cloth moistened with cleaning fluid. (Refer to Section 4-2-6.) After cleaning, wipe with a dry cleaning cloth. 5-41 SRW-5000/5500...
Page 248
[F9] (CAPSTN MOTOR) of the SERVO CHECK menu 10. Performing the Servo Adjustment Refer to Section 3-4-2. [F2] (AUTO ADJ) of the SERVO ADJUST menu 11. Adjusting the Tape Running at Drum Exit Side Refer to Section 6-12-2. 5-42 SRW-5000/5500...
. Cleaning cloth: 3-184-527-01 . Cleaning fluid: 9-919-573-01 Preparation 1. Turn the power off and disconnect the power cord. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 5-43 SRW-5000/5500...
Page 250
Cleaning the reel motor shaft. S-reel: Poly-slider washer (t = 0.13 mm) x1 Sony part No. : 3-701-441-01 Poly-slider washer (t = 0.25 mm) x1 Sony part No. : 3-701-441-11 T-reel: Poly-slider washer (t = 0.13 mm) x1 Sony part No.
Remove/Attach the Brake Lining ment is removed. (1) Turn on the power. (2) While the reel table is rotating, check that the brake lining does not contact with the reel table at the reel tables of S and T sides. 5-45 SRW-5000/5500...
. Cleaning cloth: 3-184-527-01 . Cleaning fluid: 9-919-573-01 Preparation 1. Turn the power off and disconnect the power cord. 2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) 5-46 SRW-5000/5500...
Page 253
ME wire from the plate holder (T) assembly. T drawer assembly (4) Remove the ME wire from the T drawer assembly as shown in the figure. Holes Plate holder (T) assembly Wire cover Claw Remove the ME Wire 5-47 SRW-5000/5500...
Page 254
The reel motor assembly cannot be removed in the S or T cassette position. (3) Remove the screw to remove the shaft holder. Gear Reel motor assembly Notch Guide Plate holder assembly This figure shows the T side. Remove the Shaft Holder 5-48 SRW-5000/5500...
Page 255
RS table block assembly. Remove/Attach the Reel Motor Assembly (2) Pass the ME wire and the lug terminal through the plate holder (T) assembly. (3) Insert the slide shaft in the motor holder assembly. 5-49 SRW-5000/5500...
Page 256
(2) Confirm that the reel motor assembly moves smoothly when bringing to the S cassette position and L cassette position. (As for the method of shifting the reel motor Slide shafts Hole assembly, refer to Section 5-1-3.) Reattach the Shaft Holder and Apply Grease 5-50 SRW-5000/5500...
Page 257
[F5] (S REEL MOTOR) and [F6] (T REEL MOTOR) of the SERVO CHECK menu 13. Performing Servo Adjustment Refer to Section 3-4-2. [F2] (AUTO ADJ) of the SERVO ADJUST menu 14. Adjusting the Tape Running at Drum Entrance Side Refer to Section 6-12-1. 5-51 SRW-5000/5500...
2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) Removal 1. Removing the Reel Motor Assemblies Remove the reel motor assemblies of the S side and T side. (Refer to steps 1 to 4 in Section 5-13.) 5-52 SRW-5000/5500...
Page 259
6. Confirming the Tape Running at Drum Operation Entrance Side (1) Turn the power on. Refer to Section 6-12-1. (2) Press the switch S1002 on the SS-95 board and check if the reel shift motor operates smoothly. (Refer to Section 5-1-3.) 5-53 SRW-5000/5500...
Remove the reel motor assemblies of the S side and T side. (Refer to steps 1 to 4 in Section 5-13.) 2. Removing the Motor Holder Assembly Remove the motor holder assemblies of the S side and T side. (Refer to step 2 in Section 5-14.) 5-54 SRW-5000/5500...
Page 261
9. Confirming the Reel Shift Motor Entrance Side Operation Refer to Section 6-12-1. (1) Turn the power on. (2) Press the switch S1002 on the SS-95 board and check if the reel shift motor operates smoothly. (Refer to Section 5-1-3.) 5-55 SRW-5000/5500...
Refer to Section 5-18. Refer to “Adjustment after Replacement” in Section 5-18. TG-10 T drawer assembly Refer to Section 5-21. Refer to “Adjustment after Replacement” in Section 5-21. Slant guide For the exploded views, refer to the maintenance manual volume 2. 5-56 SRW-5000/5500...
Clamper assembly. PWH3 x 8 Tape end sensor As the edge of tape cleaner is sharp, use great care to avoid a hand cut. Tape cleaner S plate (At the attaching) assembly Pins Remove/Attach the S Plate Assembly 5-57 SRW-5000/5500...
Page 264
(3) Fix the remaining harnesses disconnected in (2) of step 1 to the clamper Adjustment after Replacement 3. Adjusting the Tape Running at Drum Entrance Side Refer to Section 6-12-1. Clamper Fix the Harnesses 5-58 SRW-5000/5500...
Turn the M gear of the gear box assembly in the arrow direction to shift the TG-9 to the position as shown in the figure. Move the TG-9 so that enough space to remove the gear box assembly is made. TG-9 Shift the TG-9 5-59 SRW-5000/5500...
Page 266
7. Reattaching the Video Head Cleaner Assembly Reattach the video head cleaner assembly. (Refer to steps 4 to 6 in Section 5-4.) Adjustment after Replacement 8. Confirming the Threading Motor Operation Refer to Section 3-3-4. [F7] (THREAD MOTOR) of the SERVO CHECK menu 5-60 SRW-5000/5500...
[F4] (TENSN OFFSET) of the ALT SERVO ADJUST menu 31. Confirming the Pinch Press Clearance (Refer to step 5 in Section 5-9.) 32. Adjusting the Tape Running (Refer to Sections 6-2 to 6-12.) Tools . Cleaning cloth: 3-184-527-01 . Cleaning fluid: 9-919-573-01 5-61 SRW-5000/5500...
Page 268
AT head assembly. (2) Disconnect the harness from the connector of the full-erase head. (3) Disconnect the harness from the connector of the CTL head. Harness DT-47 board CN220 Flexible board Disconnect the Flexible Board and the Harnesses 5-62 SRW-5000/5500...
Page 269
9. Removing the T Drawer Assembly Remove the T drawer assembly. (Refer to steps 1 and 2 in Section 5-21.) 10. Removing the Gear Box Assembly Remove the gear box assembly. (Refer to steps 1 to 4 in Section 5-17.) 5-63 SRW-5000/5500...
Page 270
(portion 16. Confirming the Threading Ring Operation Turn the portion B of the threading ring assembly vertically with fingers and confirm that the threading ring and the three ring rollers rotate smoothly while repeating the threading and unthreading. 5-64 SRW-5000/5500...
Page 271
25. Reattaching the PA Guard (1) Put the PA guard through the cassette brace, then match the pins with the holes of the MD base assembly. (2) Tighten the one screw. Tightening torque: 78.4 x 10 {8.0 kgf.cm} 5-65 SRW-5000/5500...
Page 272
Connect the Flexible Board and the Harnesses Refer to Section 3-4-2. [F4] (TENSN OFFSET) of the ALT SERVO ADJUST menu 31. Confirming the Pinch Press Clearance Refer to step 5 in Section 5-9. 32. Adjusting the Tape Running Refer to Sections 6-2 to 6-12. 5-66 SRW-5000/5500...
2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) Removal 1. Removing the S Plate Assembly Remove the S plate assembly. (Refer to step 1 in Section 5-16-1.) 5-67 SRW-5000/5500...
Page 274
(5) Check that the harness is not on the cassette compartment mounting surface (shaded Positioning pin portion in the figure). 4. Reattaching the S Plate Reattach the S plate assembly. Positioning hole Cleaning (Refer to step 2 in Section 5-16-1.) Attach the S Tension Regulator Assembly 5-68 SRW-5000/5500...
Page 275
Adjustment after Replacement 5. Performing the Tension Offset Adjustment Refer to Section 3-4-2. [F4] (TENSN OFFSET) of the ALT SERVO ADJUST menu 6. Adjusting the Tape Running Refer to Sections 6-2 to 6-12. 5-69 SRW-5000/5500...
2. Turn the power off and disconnect the power cord. 3. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 4. Remove the cassette compartment. (Refer to Section 1-5.) 5. Open the AE-31H board. (Refer to the figure in Section 5-1-2.) 5-70 SRW-5000/5500...
Page 277
Remove the two screws fixing the EQ harness retainer and remove the EQ harness retainer. The screw (PWH3 x 8) fixes the EQ harness retainer with the DT-47 board. DT-47 board Flexible board CN220 Disconnect the Flexible Board and EQ Harness Retainer 5-71 SRW-5000/5500...
Page 278
CN207 on the Harness clamp T tension regulator TR-120 board. assembly (2) Remove the two screws and remove the T Harness tension regulator assembly in the arrow TR-120 board direction. CN207 Remove the T Tension Regulator Assembly 5-72 SRW-5000/5500...
Page 279
(2) Confirm that the roller of the T tension Threading ring assembly regulator assembly does not come off from the threading ring and operates normally. T Tension Regulator Assembly Operation If the above items cannot be satisfied, remove and attach the T tension regulator assembly again. 5-73 SRW-5000/5500...
Page 280
Reattaching the EQ Harness Retainer and Flexible Board Adjustment after Replacement 11. Performing the Tension Offset Adjustment Refer to Section 3-4-2. [F4] (TENSN OFFSET) of the ALT SERVO ADJUST menu 12. Confirming the Tape Running at Drum Exit Side Refer to Section 6-12-2. 5-74 SRW-5000/5500...
1. Set the unit into the unthreading end mode. (Refer to step 2 in Section 5-1-2.) 2. Turn the power off and disconnect the power cord. 3. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 4. Remove the cassette compartment. (Refer to Section 1-5.) 5-75 SRW-5000/5500...
Page 282
(B) while turning the T Positioning boss (A) T drawer drawer assembly in the arrow C direction. assembly Threading ring assembly Positioning boss (B) Positioning boss (A) Positioning hole (B) Positioning hole (A) Remove the T Drawer Assembly 5-76 SRW-5000/5500...
Page 283
(5) Hang the harness on the hook of the T drawer assembly to fasten it. Positioning boss (A) Be careful not to apply excessive force to the adjusting arm. Positioning hole (B) Positioning hole (A) Attach the T Drawer Assembly 5-77 SRW-5000/5500...
Page 284
(3) Turn the T reel table while pressing the reel brake assembly in the arrow direction, and confirm that the T reel table rotates smoothly Brake assembly without contacting with the ME arm. Wire holder Confirm the ME Wire Operation 5-78 SRW-5000/5500...
Page 285
T drawer assembly again. Surface B Roller Threading ring At the unthreading state, the lower surface of the roller does not touch with the surface B of the threading ring. Confirm the T Drawer Assembly Operation 5-79 SRW-5000/5500...
Page 286
(2) Then put the unit into PLAY mode, and check again that the tape running condition satisfies the specification at TG-10 guide. TG-10 guide If the specification is not satisfied, repeat steps 8 Adjust the Slant Guide Slantness and 9 mentioned above. 5-80 SRW-5000/5500...
2. Remove the upper lid (front) assembly. (Refer to Section 1-3-1.) 3. Remove the cassette compartment. (Refer to Section 1-5.) Tools . L wrench (Across flat has 0.89 mm): 7-700-736-06 . Grease (SGL-601): 7-651-000-10 . Cleaning cloth: 3-184-527-01 . Cleaning fluid: 9-919-573-01 . Calipers (or the equivalent) 5-81 SRW-5000/5500...
Page 288
Motor joint 5. Removing the Spacer and Disconnecting the Harness (1) Remove the spacer. Spacer Harness's wires (2) Unsolder and disconnect the harness’s wires from the motor. Cassette compartment motor Remove the Cassette Compartment Motor (2) 5-82 SRW-5000/5500...
Page 289
Motor joint when the motor joint is pushed toward the motor, and tighten the set screw. Tightening torque: 60 x 10 {6 kgf.cm} Press Motor joint Cassette compartment motor Spec.: 3.8 mm 4.2 mm Attach the Motor Joint 5-83 SRW-5000/5500...
Page 290
Attach the Cassette Compartment Motor Adjustment after Replacement 12. Checking the Cassette Compartment Motor Operation Refer to Section 3-3-4. [F8] (CCM MOTOR) of the SERVO CHECK menu Perform this check with the cassette compartment installed in the unit. 5-84 SRW-5000/5500...
. When the fan motor stops because of trouble, some components inside the unit may be heated to high temperatures. Take care not to burn your hands by touching these components. In service operation, turn off the power and perform the service operation after the temperatures turns to ordinary state. 5-85 SRW-5000/5500...
Disconnet the harnesses or coaxial cables con- Edge holder nected to the plug-in boards according to neces- Coaxial cables sary. Hold the plug to remve the coaxial cables in disconnecting the coaxial cables from the connec- tor on the boards. Remove the Cable Protector 5-86 SRW-5000/5500...
Page 293
PS4 x 20 Tightening torque: 140 x 10 {14.0 kgf.cm} Pay attention not to mistake the direction of the labeled side and the harness direction. MB-964 board CN71 CN72 Remove/Attach the Fan Motor 5-87 SRW-5000/5500...
Page 294
Cable protector the bead tie and edge holder as shown in the figure. (2) Slide the cable protector in the arrow direc- tion to reattach. Bead tie Guide rail (L) Edge holder Coaxial cables Attach the Cable Protector 5-88 SRW-5000/5500...
Fan motor A from the connectors CN73 and CN74 on the MB-964 board. (2) Remove the harnesses of the fan motors from the each harness clamp. CN74 MB-964 board Harness CN73 Harness clamp Fan motor B Disconnect the Harnesses 5-89 SRW-5000/5500...
Page 296
(1) Connect the each harness of the fan motor to the connectors CN73 and CN74 on the MB- 964 board. Fan motor A: CN74 B: CN73 (2) Hook the harnesses to each harness clamp. CN74 MB-964 board Harness CN73 Harness clamp Fan motor B Connect the Harnesses 5-90 SRW-5000/5500...
(3) Fix the power supply unit to the power supply installing plate and chassis with two screws. Tightening torque: 80 x 10 {8.0 kgf.cm} 3. Checking the Power Supply Output CN100 MB-964 board Power supply installing plate Voltage (Refer to Section 8-2.) Remove/Attach the Power Supply Unit 5-91 SRW-5000/5500...
(3) Remove the screw and remove the dial knob. (4) Remove the three screws and remove the dial B3 x 6 assembly. Rear cover PSW2.6 x 5 Dial assembly BVTP3 x 8 Key panel frame Dial knob Dial knob rubber Remove the Dial Assembly 5-92 SRW-5000/5500...
Page 299
Dial assembly {8.0 kgf.cm} BVTP3 x 8 Key panel frame Adjustment after Replacement Dial knob Dial knob rubber 5. Confirming the Search Dial Operation Refer to Section 3-3-3. Attach the Dial Assembly [F1] (DIAL) of the PANEL CHECK menu 5-93 SRW-5000/5500...
(2) Remove the eight screws and remove the key panel assembly. (3) Disconnect the flexible card wire from the connector CN1 on the KY-526 board. Key panel assembly MULTI CONTROL knob B3 x 6 Remove/Attach the Key Panel Assembly 5-94 SRW-5000/5500...
Page 301
(1) Connect the flexible card wire to the connec- tor CN1 on the KY-526 board. (2) Reattach the key panel assembly to the key panel frame, then fix it with eight screws. Tightening torque: 80 x 10 {8.0 kgf.cm} (3) Reattach the MULTI CONTROL knob. 5-95 SRW-5000/5500...
Page 302
6. Reattaching the Rear Cover Reattach the rear cover. (Refer to step 4 in Section 5-25.) Adjustment after Replacement 7. Color Display Indication Test Refer to Section 3-3-3. [F5] (LCD) of the PANEL CHECK menu 5-96 SRW-5000/5500...
(Refer to step 1 in Section 5-25.) 2. Removing the Key Panel Assembly Remove the key panel assembly. (Refer to step 2 in Section 5-26-1.) 3. Removing the LCD Unit Remove the LCD unit. (Refer to step 3 in Section 5-26-1.) 5-97 SRW-5000/5500...
Page 304
Reattach the rear cover. PTP2 x 4 Hole (Refer to step 4 in Section 5-25.) Adjustment after Replacement Hook 9. Color Display Indication Test Refer to Section 3-3-3. [F5] (LCD) of the PANEL CHECK menu Attach the Lamp Unit 5-98 SRW-5000/5500...
(1) Remove the two screws and remove the organic EL indicator module. (2) Disconnect the flexible card wire from the connector CN1 on the organic EL indicator module. Organic EL indicator module Remove the Organic EL Indicator Module 5-99 SRW-5000/5500...
Page 306
Reattach the rear cover. (Refer to step 4 in Section 5-25.) Connector surface 40 mm Adjustment after Replacement 7. OEL Indication Test Refer to Section 3-3-3. [F6] (OEL) of the PANEL CHECK menu 40 mm Attach the Organic EL Indicator Module 5-100 SRW-5000/5500...
(2) Connect the harness to the connector CN1 on the inverter unit. Nylon rivets Inverter unit 4. Reinstalling the CP-382 Board Remove/Attach the Inverter Unit Perform the steps 11 to 15 in Section 5-30-6 to reinstall the CP-382 board. 5-101 SRW-5000/5500...
Page 308
Adjustment after Replacement 5. Color Display Indication Test Refer to Section 3-3-3. [F5] (LCD) of the PANEL CHECK menu 5-102 SRW-5000/5500...
PC card adaptor. Installation 2. Attaching the PC Card Adaptor Insert a new PC card adaptor to the card slot of the system setup panel. PC card adaptor Card slot eject button Remove/Attach the PC Card Adaptor 5-103 SRW-5000/5500...
TC-104 board. TC-104 board 9. Perform the installation in the reverse order from steps 3 to 8. Board hinges Steps after Replacement 10. Perform the CUE playback system adjust- ment. (Refer to Section 8-5-4.) Remove the AE-31H Board (2) 5-104 SRW-5000/5500...
Page 311
Cassette compartment assembly CN933 Steps after Replacement Remove the CL-29 Board 8. Confirm that the compartment part of the cassette compartment assembly moves up and down normally by [F8] (CCM MOTOR) of the SERVO CHECK menu. (Refer to Section 3-3-4.) 5-105 SRW-5000/5500...
BVTT3 x 6 Use the longer screws (BVTT3 x 10) for fixing the double-type connector. CP-377 board Steps after Replacement Connector panel assembly 6. Check the output level of each analog audio. (Refer to Section 1-25-5.) Remove the CP-376/CP-376A Board 5-106 SRW-5000/5500...
Fix the rug terminal of the ground harness to Remove the CP-377 Board the CP-378 board properly. Steps after Replacement 8. Check if the component video output signal and composite video output signal are normally output. (Refer to Section 1-25-6.) 5-107 SRW-5000/5500...
. Fix the rug terminal of the ground harness Remove the CP-378 Board to the CP-378 board properly. Steps after Replacement 6. Check the input/output level of the AES/EBU channel. (Refer to Section 1-25-7.) 5-108 SRW-5000/5500...
10. Reattach the inverter unit to a new CP-382 Insulating sheet board, then fix it with the two nylon rivets. Nylon rivets Insert the inverter unit to the insulating sheet. 11. Reconnect the three harnesses disconnected in steps 7 and 8. Remove/Attach the CP-382 Board 5-109 SRW-5000/5500...
Page 316
(Refer to step 4 in Secion 5-25.) 17. Reattach thecontrol panel assembly to the KY-527 board unit. (Refer to Section 1-6.) Attach the CP-382 Board Steps after Replacement 18. After replacing the CP-382 board, perform the “After replacing the NV-RAM” in Section 1-25-8. 5-110 SRW-5000/5500...
4. Perform the installation in the reverse order from steps 2 and 3. CUE-13 board Steps after Replacement 5. Perform the CUE playback system adjust- ment. (Refer to Section 8-5-4.) Remove the CUE-13 Board 5-111 SRW-5000/5500...
HP-110 board. HP-110 board 7. Perform the installation in the reverse order from steps 2 to 6. Steps after Replacement 8. Perform the Tele-File system adjustment. (Refer to Section 8-9.) FP-131 board Remove the DIO-69 Board 5-112 SRW-5000/5500...
Page 319
7. Disconnect all the harnesses and flexible boards connected from the connectors (CN65, 200 to 208, 210, 212 to 216 ) on the DR-508 board. CN201 CN65 CN207 CN200 CN215 CN213 CN212 CN203 CN202 CN208 CN214 CN210 CN206 CN216 CN204 CN205 Disconnect the Harnesses 5-113 SRW-5000/5500...
Page 320
CN206 (Refer to Section 5-1-3.) CN216 Be careful not to close the DR-508 board while the reel tables are left at the S or L cassette position. Or the reel position sensor may damage. CN203 Arrange the Harnesses 5-114 SRW-5000/5500...
Page 321
CN205 arrow direction. 19. Reattach the bottom plate. (Refer to Section 1-3-2.) Steps after Replacement Flexible boards 20. Perform the servo/DT system adjustment. DR-508 board (A side) (Refer to Section 8-3.) Connect the Flat Cables and Flexible Boards 5-115 SRW-5000/5500...
DT-47 board. CN201 8. Perform the installation in the reverse order Harness from steps 2 to 7. Steps after Replacement DT-47 board 9. Perform the servo/DT system adjustment. (Refer to Section 8-3.) Remove the DT-47 Board 5-116 SRW-5000/5500...
Steps after Replacement BVTT 3 x 6 12. After replacing the FP-131 or FP-132 board, check the operation of the board. (Refer to Section 1-25-14 or 1-25-15.) FP-131 board BVTT3 x 6 FP fixed plate Remove the FP-131/132 Board 5-117 SRW-5000/5500...
8. Remove the three screws and remove the HP- 110 board. 9. Perform the installation in the reverse order from steps 2 to 8. Steps after Replacement 10. Check if the headphone volume functions. (Refer to Section 1-25-18.) Washer Volume knob Remove the HP-110 Board 5-118 SRW-5000/5500...
Tighten the eight screws removed in step 5 as following torque. Tightening torque: 46 x 10 {4.5 kgf.cm} Key panel sub assembly Steps after Replacement Replace the KY-526 Board 7. Check the key operation. (Refer to Section 3-3-3.) [F7] (KEY) of the PANEL CHECK menu 5-119 SRW-5000/5500...
Tighten the seven screws removed in step 4 as following torque. Tightening torque: 80 x 10 {8.0 kgf.cm} Steps after Replacement 6. Check the key operation. (Refer to Section 3-3-3.) [F7] (KEY) of the PANEL CHECK menu Key panel frame Replace the KY-527 Board 5-120 SRW-5000/5500...
CN1 on the SWC-43 board. 6. Perform the installation in the reverse order from steps 2 to 5. BVTT3 x 6 SWC-43 board Steps after Replacement 7. Check that the switches and indicators Remove the SWC-43 Board function normally. 5-121 SRW-5000/5500...
Disconnect the Flat Cables and Harnesses (1) 10. Remove the AC panel. (Refer to Section 1-3-4.) 11 Disconnect the harnesses from the connectors CN75 CN68, CN71, CN72, CN75, and CN76 on the CN76 MB-964 board. MB-964 board CN72 CN68 CN71 Disconnect the Harnesses (2) 5-122 SRW-5000/5500...
Page 329
16. Perform the installation in the reverse order from steps 2 to 15. Steps after Replacement Positioning pin 17. Check that the unit functions normally. MB-964 board Remove the MB-964 Board (2) 5-123 SRW-5000/5500...
Remove the TC-104 Board from steps 2 to 7. Fix the CTL harness to the plate with a new bundling band (or equivalent) surely. Steps after Replacement 9. Perform the LTC system and full erasure current adjustment. (Refer to Section 8-8.) 5-124 SRW-5000/5500...
When the unit has power applied to it and the reel motor AT head height, azimuth, head-to-tape is rotating slowly, the cassette tape cannot be inserted contact, or position. properly. CUE Level Check and Adjustment in REV mode Tape Running Check and Adjustment SRW-5000/5500...
(2) When the tape path adjustment is performed with the cassette compartment removed, the tape protection circuit is activated and the “ERROR” message may be displayed. In this case, turn the power off, then turn it on again. SRW-5000/5500...
Bit-1 of S101/SS-95: ON (upper side): Enables tracking control manually (RV1001/SS-95). OFF (lower side): Fixes tracking control. After the adjustment, set the Bit-1 of the S802 to OFF to fix the tracking control. <SS-95 board, side A> RV1001 (Tracking VR) S802 SRW-5000/5500...
When loosening the following screws, apply the locking compound to the screws after adjustment is completed. The locking compound that applied to other surrounding parts must be wiped off using gauze or soft cloth. . Locking compound : 7-432-114-11 AT head assembly SRW-5000/5500...
[F1] SYSTEM LINE [||] [||] 1080 1080 [F2] SYSTEM SCAN [||] [||] [||] Interlace Interlace Progressive [F3] SYSTEM FREQ. [||] [||] [||] [||] [||] [||] [||] [||] 59.94 Hz 23.98 29.97 59.94 [F7] ACTIVE LINE [||] [||] 1080 1080 1035 SRW-5000/5500...
Page 336
Connect the oscilloscope as follows: S1002 CH-1: TP52/EQ-94 board (CNF CG ENV signal) CH-2: TP5/EQ-94 board (SWP5 signal) TRIG: Set CH-2 as TRIG input. Preparation Oscilloscope setting: CH-1: 100 mV to 200 mV/DIV CH-2: 5 V/DIV TIME: 0.5 to 1 ms/DIV SRW-5000/5500...
Page 337
If specifications 1 and 2 are not satisfied, a x 100 < 20 % b x 100 < 20 % c x 100 < 20 % perform the adjustment in the Section 6-3 (Tape Entrance Side) or Section 6-4 (Tape Exit Side). Video Tracking Check (PLAY) SRW-5000/5500...
Page 338
Waveforms appear with no lacking. Uniform waveforms without variation. . In the case of the drum entrance side is NG (Example) : (NG) (NG) . In the case of the drum exit side is NG (Example) : (NG) (NG) SRW-5000/5500...
Page 339
Tape curl volume TG-3 TG-4 TG-5 Spec.4 : The tape curl of the upper flange of TG-3 and lower flange of TG-4 are less than 1/10 of the tape width. Video Tracking Check (REV x x x x x 1) SRW-5000/5500...
Page 340
TRIG : CH-2 CH-2: TP5/ EQ-94 board (SWP5) TRIG: Set CH-2 as TRIG input. <EQ-94 board, side A> Oscilloscope setting CH-1: 100 to 200 mV/DIV TP52 CH-2: 5V/DIV TIME: 0.5 to 1 ms/DIV Oscilloscope Connection (Spec.6 is NG) 6-10 SRW-5000/5500...
Page 341
(ADV BF2 ENV signal) TP84/EQ-94 board (ADV CG2 ENV signal) TP92/EQ-94 board (ADV DH2 ENV signal) (10)Turn off the power, and remove the HR5-1B. (11)Reset Bit-1 and Bit-3 of the DIP switch S802 on the SS-95 board to OFF (upper side). 6-11 SRW-5000/5500...
Page 342
CONFI Head Output Check (1) Turn on the power. (2) Return the system setting to the customer setting noted down in (2) of step 1. (HOME menu → [SFT] + [DIAG] → [SFT] + [F8] → [F9] → SYSTEM menu) 6-12 SRW-5000/5500...
. Do not rotate screws other than those specified in the adjustments. Take note that performing adjustments other than those required for making the RF envelope waveform flat may result in damages such as abnormal wear of mechanism parts and accompa- nying deterioration of electrical characteristics. 6-13 SRW-5000/5500...
Page 344
RF max If the pressure against the tape at TG-2 is too much, the waveform becomes as Marker shown in the upper figure. (NG) Spec.9 : The RF envelope waveform is flat. Tracking Adjustment at Tape Entrance Side (PLAY) 6-14 SRW-5000/5500...
Page 345
(1) Turn off the power, then remove the HR2-1B. CH-1 (2) Set the alignment tape HR2-1A and put a <SRW-5000>: TP52/EQ-94 board (ADV AC ENV signal) weight (about 1 kg) onto it. <SRW-5500>: TP44/EQ-94 board (CONF AC ENV signal) CH-2 (3) Set Bit-1 and Bit-3 of the DIP switch S802 on <SRW-5000/5500>: TP5/EQ-94 board (SWP5 signal)
Page 346
2 Set the HR2-1B, and put a weight (about 1 kg) onto it. 3 Reset Bit-3 of the DIP switch S802 on the SS-95 board to OFF (lower side). 4 Turn on the power, and perform (2) of step 1 and later. 6-16 SRW-5000/5500...
Page 347
Tape-running Check at the Tape Entrance Side 4. Recheck the Video Tracking Perform steps from 4 to 10 in Section 6-2. After adjusting, be sure to reset Bit-1 and Bit-3 of the DIP switch S802 on the SS-95 board to OFF (lower side). 6-17 SRW-5000/5500...
CL guide rail . Do not pull out the screws because the screw holes on the CL guide rail are shaped in such a way to prevent screws from falling. CL Guide Rail Removal 6-18 SRW-5000/5500...
Page 349
AT head zenith. . If the tape moves upward at TG-3: Zenith adjustment screw Turn the zenith adjustment screw AT head counterclockwise. . If the tape moves downward at TG-4: Turn the zenith adjustment screw clockwise. 6-19 SRW-5000/5500...
Page 350
(NG) If the AT head height does not satisfy the specifi- cation, restart the video tracking adjustment. <Fig.3> CH-1 : TP52/EQ-94 board RF max A = RF max x 0.8 C x 100 > 70 % Spec.15 : 6-20 SRW-5000/5500...
Page 351
Turn off the power, then attach the CL guide rail. 4. Recheck the Video Tracking Perform the steps 4 through 10 in Section 6-2 again. After adjustment, be sure to reset Bit-1 of the DIP switch S802 on the SS-95 board to OFF (lower side). 6-21 SRW-5000/5500...
(3) Turn on the power. 2. Connect the Oscilloscope TP400 Connect the oscilloscope as follows: CH-1: TP400/TC-104 board (CTL PB signal) TRIG: TP200/SS-95 board (SV REF signal) Oscilloscope setting: CH-1: 0.5 V/DIV TIME: 5 ms/DIV <SS-95 board, side A> TP200 Preparation 6-22 SRW-5000/5500...
Page 353
Adjustment nut B When the Level Increases by Pushing Up the Tape Turn the adjustment nut clockwise (in the arrow B direction) so that the output waveform is maximum. <CTL output waveform> Maximize CTL Head Height Adjustment 6-23 SRW-5000/5500...
Page 355
) is 80 % or more against the maximum output level (L under the enabling state of the tracking control. If they does not satisfy the specifications 1 and 2, perform step 4 and later. CTL Head Position Check 6-25 SRW-5000/5500...
Page 356
OFF (lower side). CTL Head Position Adjustment After the Adjustment 6. Adjust Drum Phase Refer to Section 7-2-3. 7. Adjust Digital DT System Refer to Sections 7-2-5 and 7-2-6. 8. Adjust the AT Head Position Refer to Section 6-9. 6-26 SRW-5000/5500...
(about 1 kg) onto it. <AE-31H board, side A> (3) Turn on the power. 2. Connect the Oscilloscope Connect the oscilloscope as follows: CH-1: TP300/AE-31H board (CUE signal) TP300 Oscilloscope setting: CH-1: 200 mV/DIV TIME: 5 ms/DIV Preparation 6-27 SRW-5000/5500...
Page 358
B of the tape, and check to see that the CUE level decreases. AT head If the level increases, perform the step 4-B. <CUE output waveform> Spec. : The level decreases when the tape is moved up and down. AT Head Height Check 6-28 SRW-5000/5500...
Page 359
8. Recheck the AT Head Height (Top view) Refer to step 3 in this section. 9. Recheck the AT Head AT Head Height Adjustment Perform the steps 5 through 7 again. 10. Apply the Locking Compound Refer to Section 6-1-9. 6-29 SRW-5000/5500...
(about 1 kg) onto it. <AE-31H board, side A> (3) Turn on the power. 2. Connect the Oscilloscope Connect the oscilloscope as follows: CH-1: TP300/AE-31H board (CUE signal) TP300 Oscilloscope setting: CH-1: 200 mV/DIV TIME: 5 ms/DIV Preparation 6-30 SRW-5000/5500...
Page 361
Refer to Section 6-9. <CUE output waveform> 5. Adjust the AT Head Position Refer to Section 6-10. 6. Check the AT Head Height Maximize Refer to Section 6-7. 7. Apply the Locking Compound Refer to Section 6-1-9. AT Head Azimuth Adjustment 6-31 SRW-5000/5500...
(2) Set the HR2-1A, and put a weight (about 1 kg) onto it. <AE-31H board, side A> (3) Turn on the power. 2. Connect the Oscilloscope Connect the oscilloscope as follows: TP300 CH-1: TP300/AE-31H board (CUE signal) Oscilloscope setting: CH-1: 200 mV/DIV TIME: 5 ms/DIV Preparation 6-32 SRW-5000/5500...
Page 363
(3) Check that the increased amount of output level satisfies the specification. If the specification is not satisfied, perform AT head steps 4 and later. <CUE output waveform> Spec. : Increased amount of the output level is within 5 %. AT Head Head-to-tape Contact Check 6-33 SRW-5000/5500...
Page 364
After the adjustment Maximize 6. Check the AT Head Position Refer to Section 6-10. 7. Check the AT Head Height AT Head Head-to-tape Contact Adjustment Refer to Section 6-7. 8. Check the AT Head Azimuth Refer to Section 6-8. 6-34 SRW-5000/5500...
Page 366
AT Head Position Check Adjustment 4. Remove the CL Guide Rail (1) Turn off the power. B3 x 8 (2) Fully loosen the two screws, then remove the CL guide rail. CL guide rail CL Guide Rail Removal/Reattachment 6-36 SRW-5000/5500...
Page 367
9. Check the AT Head Azimuth Refer to Section 6-8. 10. Check the AT Head Head-to-tape Contact Refer to Section 6-9. 11. Check the AT Head Position Refer to step 3 in this section. 12. Apply the Locking Compound Refer to Section 6-1-9. 6-37 SRW-5000/5500...
(4) Check that the CUE output level B satisfies CH-1 the specification 1. If specification 1 is not satisfied, perform following steps 5 and later. Spec.1 : x 100 > 90 % CUE Level Check in REV Mode 6-38 SRW-5000/5500...
Page 369
The tape runs in contact with the lower flange. The tape curl is less than 1/10 of the tape width. TG-5 The tape runs without any curl at the upper and lower flanges. CUE Level Adjustment in REV Mode 6-39 SRW-5000/5500...
The tape curl is less than 1/10 of the tape width. c Lead of drum entrance side The tape runs in contact with the drum lead and without any curl at the lead. Tape-running Check at Tape Entrance Side 6-40 SRW-5000/5500...
Page 371
Perform step 2 and the video tracking check. TG-2 height adjustment TG-1 height adjustment nut (Refer to Section 6-2.) If the specifications 1 and 2 on the previous page are not still satisfied, perform the adjustment in step 3 again. TG-1 and TG-2 Height Adjustment 6-41 SRW-5000/5500...
S1002 on the SS-95 board to set the reel tables to the S cassette position. (Refer to S1002 Section 5-1-3.) (2) Turn off the power. (3) Set the S cassette and put a weight (about 1 kg) onto it. (4) Turn on the power. 6-42 SRW-5000/5500...
Page 373
Take-up side tape guide of cassette Flange The tape runs without any curl at the upper and lower Tape curl portions of the tape guide. volume Tape-running Check at Drum Exit Side 6-43 SRW-5000/5500...
Page 374
. If the tape is touching the upper flange of the TG-10 guide, rotate the adjustment screw counterclockwise. . If the tape is touching the lower flange of the Slant Guide Slantness Adjustment TG-10 guide, rotate the adjustment screw clockwise. 6-44 SRW-5000/5500...
Page 375
(1) Press the STOP button to set the unthreading end mode. (2) In the PLAY mode, check that the tape satisfies specification 4 (previous page) when running at the TG-10 guide. If specification 4 is not satisfied, repeat steps 7 and 8 above. 6-45 SRW-5000/5500...
(Part No. 8-960-073-51) Option HKSR-5002 installed model only Recording tape SONY BCT-SR series (HDCAM SR cassette: Separately available) Use the blank tape erased using a tape eraser in advance or a new blank tape as a recording tape for the adjustment. SRW-5000/5500...
Page 379
Option HKSR-5002 (Automatic adjustment) [F4] (EQULZR ADJ) installed model only. Data saving EQUALIZER ADJUST menu [F1] (NVRAM CTL) 7-2-8 Recording current adjustment HDCAM SR RF ADJUST menu (Automatic adjustment) [F5] (REC ADJ) Data saving REC ADJUST menu [F1] (NVRAM CTL) SRW-5000/5500...
7. Press the [F10] (EXIT) key two times to exit the ALT 8. Perform the next adjustment (Section 7-2-5). SERVO ADJUST menu. (Display the ALT MAINTE- NANCE Menu.) 8. Perform the next adjustment (Section 7-2-4). SRW-5000/5500...
6. Change the system to the 25 Hz and 23.976 Hz mode 7. Exit the maintenance mode. referring to Section 7-1-3., then perform the steps 2 to 7 again for each mode. 7. Reset the system to the 29.97 Hz mode referring to Section 7-1-3. 8. Exit the maintenance mode. SRW-5000/5500...
2 to 7 again for each mode. 7. Reset the system to the 29.97 Hz mode referring to 7. Reset the system to the 29.97 Hz mode referring to Section 7-1-3. Section 7-1-3. 8. Exit the maintenance mode. 8. Exit the maintenance mode. SRW-5000/5500...
7. Select the “SAVE ALL DATA” by pressing the cursor keys, then press the [F10] (EXIT) key to saving data. . The message “Save Complete” will be displayed when this data save is completed normally. 8. Eject the alignment tape. 9. Perform the next adjustment “2. HDCAM Format”. SRW-5000/5500...
7. Select the “SAVE ALL DATA” by pressing the cursor keys, then press the [F10] (EXIT) key to saving data. . The message “Save Complete” will be displayed when this data save is completed normally. 8. Eject the recording tape. 9. Exit the maintenance mode. SRW-5000/5500...
Page 386
7. Select the “SAVE ALL DATA” by pressing the cursor keys, then press the [F10] (EXIT) key to saving data. . The message “Save Complete” will be displayed when this data save is completed normally. 8. Eject the recording tape. 9. Exit the maintenance mode. 7-10 SRW-5000/5500...
HR5-1B (Part No. 8-960-076-31) Recording tape Sony BCT-SR series (HDCAM SR cassette: Separately avilable) Use the blank tape erased using a tape eraser in advance or a new blank tape as a recording tape for the adjustment. Shorting clip 7-11...
TIME: 100 µs/DIV . Osilloscope: TEKTRONIX TDS3054B or equivalent 2. Insert the alignment tape HR5-1B. . Time code generator: SONY BVG-1600 or equivalent 3. During play back the alignment tape in the PLAY . Time code reader: SONY BVG-1500 or equivalent mode, check the level on the oscilloscope.
Page 392
4 in PLAY mode. (Regard a level of the audio-signal- Specification: A > 250 mV p-p recorded portion as 0 dB.) Oscilloscope TP201 TP301 E100 E400 TP200 TP100 TP400 LV200 TP101 TP401 TP102 CH-1 TC-104 Board (Side A) 7-16 SRW-5000/5500...
(Refer to “7-3-2. Common Preparation”.) TP102 RV101 TP301 6. Check the warming up. TP300 TP100 E103 Warming up of equipment to be used (20 minutes or RV103 E100 more). S100 TP101 RV100 RV102 CN100 CUE-13 Board (Side A) 7-17 SRW-5000/5500...
SD SDI free-running frequency adjustment VPR-79 Adjustments of Analog composite Video output HD Video Section 8-7 HD Video system adjustment HPR-8/HPR-8A Full erase, Time code Section 8-8 LTC system adjustment/check and Full erasure current check TC-104 Tele-File Section 8-9 Tele-File system adjustment DIO-69 SRW-5000/5500...
+15V TP4/EX-873 _6.2 ± 0.6 V _6.2 V TP5/EX-873 _15 V _15 + 1.8/_1.4 V TP6/EX-873 If the specification is not satisfied Make sure that repair of this unit had been completed. EX-873 TP_6.2V TP+6.2V TP+2.5V TP_15V TP+15V TP+3.4V SRW-5000/5500...
INCOMPLETE” will be displayed on the color display of the unit) had been described to Section 3. Tools The following equipment (or equivalent) and fixtures are required: Alignment tapes HR2-1A (SRW-5500 only) (Part No. 8-960-076-11) HR2-1B (Part No. 8-960-076-41) HR5-1A (Part No. 8-960-076-01) HR5-1B (Part No. 8-960-076-31) SRW-5000/5500...
[F1] (NVRAM CTL) 8-3-7 HDCAM SR SAT signal level adjustment DT/SAT ADJUST menu [F4] (HDSR SAT) 8-3-8 HDCAM SAT signal level adjustment DT/SAT ADJUST menu [F6] (HDCAM SAT) 8-3-9 HDCAM SR DT measurement DT/SAT ADJUST menu [F7] (HDSR DT MES) SRW-5000/5500...
Page 404
ADJUST menu. (Display the SERVO ADJUST ADJUST menu. (Display the SERVO ADJUST menu.) menu.) 8. When the next adjustment (Section 8-3-4) is not 8. When the next adjustment (Section 8-3-4) is not performed, exit the maintenance mode. performed, exit the maintenance mode. SRW-5000/5500...
7. When the next adjustment (Section 8-3-5) is not . The message “Save Complete” will be displayed performed, exit the maintenance mode. when this data save is completed normally. 8. When the next adjustment (Section 8-3-6) is not performed, exit the maintenance mode. SRW-5000/5500...
8. Press the [F10] (EXIT) key to exit the DT/SAT 7 again for each mode. ADJUST menu. 7. Reset the system to the customer setting referring to Section 8-1-3. 9. Exit the maintenance mode. 8. Exit the maintenance mode. SRW-5000/5500...
2 to 7 again for each mode. 7. Reset the system to the customer setting referring to 7. Reset the system to the customer setting referring to Section 8-1-3. Section 8-1-3. 8. Exit the maintenance mode. 8. Exit the maintenance mode. SRW-5000/5500...
Option HKSR-5002 installed model only Recording tape SONY BCT-SR series (HDCAM SR cassette: Separately available) SONY BCT-HD series (HDCAM cassette: Separately available) SRW-5500 only Use the blank tape erased using a tape eraser in advance or a new blank tape as a recording tape for the RF system alignment.
Page 409
Remarks 8-4-3 Recording current adjustment HDCAM SR RF ADJUST menu [F5] (REC ADJ) Data saving RF ADJUST menu [F1] (NVRAM CTL) HDCAM RF ADJUST menu SRW-5500 only [F5] (REC ADJ) Data saving RF ADJUST menu [F1] (NVRAM CTL) 8-11 SRW-5000/5500...
If tape running condition is changed, optimum adjustment can not be performed. Besides the automatic adjustment operation may freeze, or the result of automatic adjustment become “NG”. . If the “NG” is displayed, refer to “For Automatic Adjustment Failure” in Section 3-4-3. 8-12 SRW-5000/5500...
Page 411
. The message “Save Complete” will be displayed when this data save is completed normally. 10. Eject the recording tape. 11. When the next adjustment “2. HDCAM Format” is not performed, exit the maitenance mode and perform the “4. Adjustment in the 25 Hz Mode”. 8-13 SRW-5000/5500...
Page 412
4. Insert the alignment tape, then rewind it to the tape beginning. 5. To execute the automatic adjustments, press the [SET] key. . After 5 minutes, the adjustments are completed, then the message [NG List : Total 0] is displayed. 8-14 SRW-5000/5500...
Before starting the adjustment, warm up the VTR through the power for 20 minutes or more. 4. Check the Operation Mode Check that the unit set into the 29.97 Hz mode. If does not, change the system setting referring to Section 8-1-3. 8-15 SRW-5000/5500...
Page 414
7. Select the “SAVE ALL DATA” by pressing the cursor keys, then press the [F10] (EXIT) key to saving data. . The message “Save Complete” will be displayed when this data save is completed normally. 8. Eject the recording tape. 9. Exit the maintenance mode. 8-16 SRW-5000/5500...
CUE Erace Current Adjustment TP601/AE-31H 1T500/AE-31H CUE Bias Frequency Adjustment TP500/AE-31H CUE Bias Trap Adjustment 1LV400/AE-31H TP401/AE-31H CUE Bias Current Adjustment 1RV500/AE-31H TP200/AE-31H CUE REC Level Adjustment 1RV400/AE-31H CUE OUT CUE REC Frequency Response Adjutment 1RV401/AE-31H CUE OUT 8-18 SRW-5000/5500...
Page 417
8 +4 dBm/600 Z (only 1-bit to ON) S101 (A-2) CUE output level ______________ 8 +4 dBm/600 Z (only 1-bit to ON) S701 S101 S400 S2300 S1300 S4200 S3200 S2200 S1200 S100 APR-62 Board (Side A) CUE-13 Board (Side A) 8-19 SRW-5000/5500...
Page 418
______________ 8 CH1 MONITOR ______________ 8 CH2 Setup menu ITEM-109 (KEY INHIBIT) ______________ 8 OFF ALT + [F6] (CHARA SUPER) TC menu ______________ 8 ON [F4] (HEAD ROOM) OTHER CHECK menu ______________ 8 20 dB (Refer to Section 3-3-9.) 8-20 SRW-5000/5500...
Page 419
2. Press the [F3] (AUDIO TST SG) key several times to select “1 kHz SINE” as test signal. 3. Set the audio analyzer as follows: Function mode: LEVEL, dBm (600 Z) Input filter: 80 kHz LPF RV2300 RV3200 RV2200 RV1300 RV4200 RV1200 APR-62 Board (Side A) 8-21 SRW-5000/5500...
Page 420
VTR is well prepared for processing adjustments. (Refer to “8-5-2. Common Preparation”.) 6. Check the warming up. RV2300 Warming up of equipment to be used (20 minutes or RV3200 RV2200 RV1300 RV4200 RV1200 more). APR-62 Board (Side A) 8-22 SRW-5000/5500...
Alignment tape HR5-1B (Part No. 8-960-076-41) Recording tape SONY BCT-SR series (HDCAM SR cassette: Separately available) Use the blank tape erased using a tape eraser in advance or a new blank tape as a recording tape for the adjustment. 8-34 SRW-5000/5500...
2. Turn on the power, and display the Tele-File CHECK menu. (HOME menu → [SFT] + [DIAG] → [SFT] + [F8] → [F9] → [F1] → Tele-File CHECK menu) DIO-69 Board (Side A) (For the Tele-File CHECK menu, refer to Section 3-3-9.) 8-38 SRW-5000/5500...
Page 437
2 V AC range are suitable. (See Fig. A) To Exposed Metal Parts on Set 0.15 µ F 1.5 k Z voltmeter (0.75V) Earth Ground Fig A. Using an AC voltmeter to check AC leakage. SRW-5000/5500...