hit counter script

Running Test - Toshiba Satellite P500 Maintenance Manual

Hide thumbs Also See for Satellite P500:
Table of Contents

Advertisement

3.16 Running Test

NOTES:
1. You may add or delete subtests using the Running Test Edit Item function, see Section
3.20.
2. Do not forget to insert a work disk in the FDD. If a work disk is not inserted an error
will be generated during the Floppy Disk Test.
3. If the test completes successfully an "PASS" sign with blue letters displays on the
screen.
4. If the test fails or is interrupted before completion an "FAIL" sign with red letters
displays on the screen.
5. If running item not select an "NOITEM" sign with green letters display on the screen.
6. All errors which occur during execution of the Running Test are logged in the Log
File.
7. This program is executed according to the Count Loop number selected in the
Running Test Edit Item, see Section 3.20. To terminate the program, press Ctrl +
Break.
60
Satellite P500 and Satellite Pro P500 Tests and Diagnostics Manual
Test Program for Field.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite pro500

Table of Contents