1. MODE SWITCH (PROGRAM SWITCH) ASSEMBLY POINT
1) When installing the ass'y deck on the Main PCB, be sure to align the assembly point of mode switch.
2. HOW TO EJECT THE CASSETTE TAPE
(If the unit does not operate on condition that tape is inserted into housing ass'y)
1) Turn the Gear Worm Œ clockwise in the direction of arrow with screw driver. (See Fig. 2)
(Other method ; Remove the screw of Motor Load Ass'y, Separate the Motor Load Ass'y)
2) When Slider S, T are approached in the position of unloading, rotate holder Clutch counterclockwise after inserting screw driver in the
hole of frame's bottom in order to wind the unwiunded tape. (Refer to Fig. 3)
(If you rotate Gear Worm Œ continuously when tape is in state of unwinding, you may cause a tape contamination by grease and
Œ GEAR WORM
Fig. 2
SERVICE NOTE
Fig. 1
– 4 –
ASSEMBLY POINT
(ALIGN TWO ARROWS)
FRAME
Fig. 3