Page 1
Operation Manual TPL69-A10 Type TPL69-A10 HT845542 Mmax Mmax °C Bmax Bmax 01780 Application according to Year 2020 the Operation Manual ABB Turbocharging...
Page 2
In case the operation conditions differs signifi cantly from what is considered to be normal for the cur- rent application, it is recommended to contact ABB for a re-calculation of replacement intervals. Frequent load alterations, high temperatures and high speed lower the life of components.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 Table of contents Operation Manual Preliminary remarks....................3 Purpose of this manual ....................3 Layout and function......................4 Intended use of the turbocharger ................6 Storage of new turbochargers and spare parts ............7 Essential information.....................
Page 4
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 Table of contents Troubleshooting..................... 71 Malfunctions when starting..................71 Surging of the turbocharger..................72 Malfunctions during operation .................. 73 Malfunctions when stopping ..................76 Speed measurement system ..................77 Removal and installation..................78 Turbocharger weights....................
Operation Manual This Operation Manual helps familiarise the user with the turbocharger from ABB Turbocharging and how to use it as intended. It provides important information in order that the turbocharger can be operated safely, correctly and efficiently.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 1 Preliminary remarks / 1.2 Layout and function 1.2 Layout and function 01Filter silencer 08Nozzle ring 02Radial plain bearing 09Turbine wheel 03Thrust bearing 10Bearing casing 04Bearing bush 11Diffuser 05Radial plain bearing 12Compressor wheel 06Gas outlet casing 13Compressor casing...
Page 7
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 1 Preliminary remarks / 1.2 Layout and function Mode of operation The turbocharger is a turbomachine and consists of the following main components: ¡ Turbine ¡ Compressor These are both mounted on a common shaft. The exhaust gases from the diesel engine flow through the gas inlet cas- ing (07) and nozzle ring (08) to the turbine wheel.
Any other use is considered to be a special application, which must first be clarified with ABB Turbocharging. The manufacturer accepts no liab- ility for any other type of use. If the equipment is used for any other purpose, ABB Turbocharging reserves the right to reject all warranty claims.
1.4 Storage of new turbochargers and spare parts Storage of new turbochargers and spare parts up to 6 months New turbochargers and spare parts from ABB Turbocharging can be stored in sealed packaging without additional mothballing measures for up to 6 months from the date of delivery (marked by the VCI label on the package).
Page 10
Seal the package. The better the external seal is designed, the more permanent the protection. Long-term storage of turbochargers The turbochargers will be prepared for prolonged storage by ABB Tur- bocharging on request. The package is equipped with a hygrometer (see illustration).
Page 12
Only use original parts from ABB. ABB accepts no liability for any damage resulting from the use of non- original parts and corresponding accessories. Competence of personnel The turbocharger must only be operated and serviced by trained and au- thorised personnel.
A rating plate is attached to the turbocharger foot, one on the left and one on the right. On turbochargers with insulation from ABB, at least one additional rating plate is attached to the insulation of the gas outlet cas- ing.
2 Safety / 2.1 Introduction 2 Safety 2.1 Introduction Turbochargers manufactured by ABB are state of the art and comply with the pertinent safety and health-protection requirements that ap- plied when the turbocharger was manufactured. Consequently, the tur- bocharger is safe to operate. Nevertheless, during turbocharger opera-...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.3 Definition of mandatory signs 2.3 Definition of mandatory signs To be worn at all times Protective clothing Safety footwear to pro- tect against mechanical hazard and risk of fall- To be worn according to the specific work Safety glasses Safety goggles...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.5 Warning plates on the turbocharger 2.5 Warning plates on the turbocharger Warning plates that must be observed are attached to the turbocharger. The warning plates must always be present in the intended locations and must be legible.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.6 Safe operation and maintenance 2.6 Safe operation and maintenance The instructions specified in this section are for the safety of personnel. Together with the instructions in the Hazards during operation and maintenance section, they allow the user to safely use the turbocharger.
Page 20
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.6 Safe operation and maintenance Safety during start-up / commissioning and operation Before starting work, carry out visual inspection of working area. Remove any obstacles and objects lying around. Before start-up / commissioning, check all pipes from and to tur- bocharger for damage and leaks.
Page 21
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.6 Safe operation and maintenance Safety during disassembly, assembly, maintenance and troubleshooting Always perform the specified adjustments, servicing as well as in- spection work and observe inspection intervals. Inform operating personnel about all service and repair work before beginning.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance 2.7 Hazards during operation and maintenance Mechanical hazards during operation During normal operation, no mechanical hazards emanate from the tur- bocharger if it has been installed properly. WARNING Risk of injury Contact with rotating parts can lead to serious injuries.
Page 23
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance Hazards due to noise The development of noise during operation is influenced by the installa- tion and operating conditions. Noise with a sound pressure level exceed- ing 85 dB(A) is harmful.
Page 24
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance WARNING Hot surfaces on uninsulated turbochargers Uninsulated turbochargers can cause serious personal injuries (burns). The turbocharger is supplied with or without insulation in accordance with the purchase order received from the enginebuilder.
Page 25
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance WARNING Risk of fire, explosion Flammable and combustible operating materials and supplies can catch fire or resulting vapours can lead to an explosion. Observe the details in the material safety data sheets of the operat- ing and auxiliary materials.
Page 26
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.7 Hazards during operation and maintenance Hazards when handling insulating materials WARNING Hazards due to insulating materials Dust and fibres from insulating materials can cause damage to health or irritations.
Heed any country-specific regulations. 2.8 Periodic checking of the pressure vessel The pressure vessels used by ABB, such as those for wet or dry cleaning, are so-called "simple pressure vessels". ¡ The locally applicable legal regulations regarding periodic checks of the pressure vessels must be observed.
Page 28
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 2 Safety / 2.9 Lifting loads In the case of two or more suspension points, the slinging angle must not exceed 45°. This avoids excessive loading due to inclined tensile loading.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 3 Start-up / 3.1 Oil supply 3 Start-up 3.1 Oil supply A carefully designed and installed oil supply, which functions in all pos- sible operational conditions, is an important prerequisite for trouble- free turbocharger operation.
Page 30
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 3 Start-up / 3.1 Oil supply Oil pressure The oil pressure in front of the turbocharger must be maintained pre- cisely to ensure trouble-free operation. The permissible oil pressure ranges at measuring point M (blind connec- tion) on the turbocharger are listed below.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 3 Start-up / 3.2 Inspection work 3.2 Inspection work Inspection work includes preventive visual controls plus monitoring and measuring work before and during commissioning. Inspections help de- tect changes to the turbocharger. Machine damage can be avoided. 3.2.1 Inspection before commissioning Monitoring devices Check for correct functioning.
Page 33
The first step is to check for leak- age of the oil supply to the turbocharger. If this is leaky, contact an offi- cial ABB Turbocharging service station. 3.2.4 Inspection after 100 service hours Clean or replace lubricating oil filters after the first 100 service hours.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 3 Start-up / 3.3 Commissioning after taking out of operation 3.3 Commissioning after taking out of operation If provided Remove cover plates (blind flanges) between compressor casing out- let and charge air duct, before gas inlet and after gas outlet. Inspect exhaust gas duct / line in front of and after turbine for any combustion deposits, foreign matter or residual water.
NOTICE Service inspection after 5 years To prevent age- and stoppage-related machine damage, an inspection by an ABB Turbocharging Service Station is recommended at the latest 5 years after the last service. 4.2.1 Service work every 25 … 50 hours Visual inspection for air, exhaust gas, water and oil leaks.
Page 38
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 4 Operation / 4.2 Servicing work 4.2.2 Entries in engine logbook By monitoring the engine, conclusions can be drawn about the tur- bocharger performance. The following operating data and measured values must be entered reg- ularly in the engine manufacturer's engine logbook: ¡...
Page 39
Inspect and assess bearing parts and rotor. 4.2.5 Service work every 24000 … 36000 hours The replacement of bearing parts and the inspection and assessment of the rotor must be carried out by an ABB Turbocharging Service Station. Disassemble turbocharger. Clearance measurement.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 4 Operation / 4.3 Replacement intervals for turbocharger components 4.3 Replacement intervals for turbocharger components Rotating components The recommended replacement intervals for the compressor and turbine wheels due to stress caused by centrifugal forces and load cycles are cal- culated under consideration of the operating conditions while applying the safety concept for rotating components.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 4 Operation / 4.4 Speed measurement 4.4 Speed measurement A speed measuring system permits continuous monitoring of the tur- bocharger speed. CAUTION Do not use cables as a climbing aid If you pull the speed measurement cables too hard, contacts can be pulled out.
Page 43
If the engine can be stopped for a short time: Inspect the air and gas lines as well as the turbocharger and eliminate any problems. In any event, it is recommended that you contact the nearest ABB Tur- bocharging Service Station. 4.4.2 Assembly...
Page 44
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 4 Operation / 4.4 Speed measurement 4.4.3 Replacing the speed sensor WARNING Hot cable connector and hot speed sensor Risk of burning. During operation, the cable connector and the speed sensor can reach temperatures exceeding 100 °C.
4 Operation / 4.5 Underpressure measurement on filter silencer 4.5 Underpressure measurement on filter silencer A U-pipe manometer can be ordered from ABB Turbocharging for the low pressure measurement on the filter silencer. The measurement can be used for the following purposes: ¡...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 4 Operation / 4.6 Stopping the engine 4.6 Stopping the engine CAUTION Stopping the engine Heat in the turbocharger must be dissipated by the further circulating lubricating oil. Allow the engine to continue running at idling speed for a further 10 minutes before stopping.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.1 Foreword to Maintenance 5 Maintenance 5.1 Foreword to Maintenance Maintenance and servicing work involves regular visual checks and clean- ing to ensure that the turbocharger and its attached units function trouble-free.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer 5.2 Cleaning the filter silencer 5.2.1 Filter silencer with tension band 81265Filter ring (if provided) 81266Cover grid 81270Tension band 81136Absorption segment 81271Lock 81137Sheet-metal covering 81268Connecting strip 81135Filter silencer body...
Page 49
Otherwise there is a risk of damage or deformation. NOTICE Replace heavily contaminated absorption segments, filter ring and damaged connecting strips with original parts from ABB Turbochar- ging. Fitting the filter silencer Assemble the insert units (E) by inserting the absorption seg- ments (81136) into the sheet-metal coverings (81137).
Page 50
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer 5.2.2 Filter silencer and connecting rod 81265 Filter ring (if provided) 81136 Absorption segment 81269 Connecting rods 81137 Sheet-metal covering 81266 Cover grid 81135 Filter silencer body 81272...
Page 52
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.2 Cleaning the filter silencer Fitting the filter silencer Assemble the insert units (E) by inserting the absorption segments (81136) into the sheet metal coverings (81137). Bend sheet metal coverings (81137) back to original shape. Insert the insert units (E) into slot guides in filter silencer unit (81135).
Page 54
¡ Wet cleaning This cleaning method is tested and approved by ABB Turbocharging. Principle of wet cleaning To clean the compressor stage during operation, water is injected in front of the compressor wheel through an injection pipe fitted in the fil- ter silencer or the suction branch.
Page 55
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.3 Cleaning the compressor during operation 5.3.1 Wet cleaning with orifice plate on filter silencer (XC2) Wet cleaning procedure for compressor with XC2 Trigger water injection according to the specifications of the en- ginebuilder.
Page 56
Operating state prerequisites for wet cleaning XC3 NOTICE To be able to carry out a satisfactory cleaning process which has been tested and is recommended by ABB Turbocharging, the following pre- requisites must be fulfilled: Engine load 50 … 85% Start of cleaning cycle in accordance with following description for wet cleaning operation with XC3.
Page 57
If the cleaning result is still not satisfactory after three attempts and the engine values are also unsatisfactory, we recommend that you have the turbocharger inspected and cleaned by an official ABB Turbochar- ging Service Station. Cleaning parameters per turbocharger compressor...
Cleaning method When cleaning the turbine components during operation, use wet clean- ing. This cleaning method is tested and approved by ABB Turbocharging. Prerequisites for wet cleaning are that the enginebuilder approves the process and his instructions are followed.
Page 59
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.4 Cleaning turbine blades and nozzle ring in opera- tion ¡ Erosion The dirt is removed by the mechanical action of the impacting water droplets. ¡ Solubility Water solubility of the contamination deposits in water.
Page 60
Prerequisites for wet cleaning of turbine The following operating state and prerequisites have been tested and approved by ABB Turbocharging for the cleaning process: The engine has just been started or the engine load has been reduced as far as possible (best cleaning is achieved at a load level of roughly 10 … 15%).
Page 61
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.4 Cleaning turbine blades and nozzle ring in opera- tion Layout of cleaning pipes Wet cleaning procedure for turbine during operation Meet prerequisites and operating state requirements without fail be- fore cleaning! Make sure water supply (01) is connected, turned on and guaranteed.
Page 62
The maximum volume of water allowed in individual cases must be determined together with an ABB Turbocharging Service Station. The influence of the cleaning water on peripheral equipment, such as a boiler, must be clarified by the operator.
Page 63
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.4 Cleaning turbine blades and nozzle ring in opera- tion Wet cleaning parameters for turbine and nozzle ring Table of cleaning para- Product Maximum tem- Injection time Water flow rate per tur- meters perature at start...
(see chapter entitled Service work). Professional overhauling of the components by an ABB Turbocharging Service Station is required, preferably using the cleaning method de- scribed in the following.
Page 65
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically 5.5.2 Turbine-end, non-rotating parts WARNING Handling operating materials and supplies Swallowing or inhaling vapours of operating materials and supplies or contact with them may be harmful to health. Do not breathe in these substances and avoid contact with the skin.
Page 66
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Repeat the soaking and brushing if necessary. Completely remove any solvents from the parts in clean water. Dry components completely. Spray cleaned surfaces with penetrating oil. Do not spray the outer surfaces of the turbocharger.
Page 67
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Dry the compressor wheel and the gap between the compressor and the bearing casing with a weak jet of compressed air. Lightly spray the gap between the compressor and the bearing casing with penetrating oil.
Page 68
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically 1. Suspend cartridge group from normal suspension point and suspend from first crane. 2. Secure two lifting loops with swivel lifting eyes in the lower push-off threads and suspend from a second crane.
Page 69
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Cartridge group with two side suspension points Or use two swivel lifting eyes at top. CAUTION Damage to compressor wheel The lifting gear must not touch the compressor wheel at any time dur- ing rotation.
Page 70
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically 4. When the cartridge group is suspended horizontally, attach a chain block to the swivel lifting eye and attach to the first crane. 5.
Page 71
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically NOTICE Heating the liquid To shorten the soaking time the liquid can be heated to maximum 60 ºC. WARNING Heating up of cleaning agents and operating fluids When cleaning agents or operating fluids are heated up, explosive va- pours can be produced which are hazardous to health.
Page 72
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 5 Maintenance / 5.5 Cleaning components mechanically Remove contamination manually with a soft brush or wire brush. CAUTION Water and contamination in the cartridge group If water or contamination gets into the cartridge group, the turbochar- ger function may be impaired and parts in the cartridge group may be damaged.
Prolonged or periodic surging Possible damage to components, such as the compressor wheel, tur- bine blades, bearings and filter silencer Have the cause clarified immediately by an ABB Turbocharging ser- vice station and rectified. Have components inspected for damage and, if necessary, replaced by an ABB Turbocharging service station.
Defective oil pump in lubricat- Check / replace it ing system Manometer display wrong Replace the manometer Turbochar- Rotor axial clearance too large Contact an ABB Turbocharging Service Station Reduction in speed Possible causes Elimination Engine Defects of connected cylinders...
Page 76
Exhaust counterpressure Clean or repair the boiler or ex- too high haust silencer Enlarged flow cross-section Contact an ABB Turbocharging of the nozzle ring due to de- Service Station formed blade trailing edges Damaged or eroded turbine Charge air...
Page 77
Contaminated filter silencer Clean it causing excessive loss of pres- sure Compressor / turbine contam- inated Damaged compressor / tur- Contact an ABB Turbocharging bine Service Station Exhaust counterpressure too Clean or repair the boiler or ex- high haust silencer...
6 Troubleshooting / 6.4 Malfunctions when stopping 6.4 Malfunctions when stopping Noises during run-down Possible causes Elimination Turbochar- Turbocharger contaminated Clean it Damaged bearing Contact an ABB Turbocharging Service Station Rubbing rotor Foreign object in turbocharger Run-down time too short Possible causes Elimination Turbochar- Turbocharger contaminated...
This problem is eliminated by removing the gasket. Defective sensor Contact ABB Turbocharging service sta- tion. Measured Dirty sensor tip The sensor tip is magnetic and can thus at- speeds too tract metal particles.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 7 Removal and installation / 7.1 Turbocharger weights 7 Removal and installation 7.1 Turbocharger weights Lifting gear with a sufficient load limit must be used for removing and installing the turbocharger. The following weight specification is the heaviest variant possible.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 7 Removal and installation / 7.2 Removing the turbocharger 7.2 Removing the turbocharger Disconnect all gas, air and oil pipes in accordance with the engineb- uilder’s instructions. CAUTION Oil orifices There is an orifice for adjusting the oil pressure in each of the two oil supply pipes of the bearing casing.
Page 82
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 7 Removal and installation / 7.2 Removing the turbocharger Ribs (01) not in the middle at the top: Completely remove the bearing casing insulation (02) and place a sling around the bearing casing. Attach one lifting gear each to the two ribs of the bearing casing provided for this purpose.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 7 Removal and installation / 7.3 Installing the turbocharger 7.3 Installing the turbocharger Remove cover from oil connection. Inspect lifting gear. Fasten separate lifting gear to each of two ribs on bearing casing provided for this purpose.
For safety and product liability reasons, work on the cartridge group that is not described in the operation manual should only be carried out by trained specialists at an ABB Turbocharging Service Station. Unqualified work on the cartridge group can lead to total system failure and void the warranty.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.2 Module weights 8.2 Module weights The specified weights of individual parts or assemblies are guides roun- ded off to the next highest value. Assemblies Weights [kg] Description TPL69-A TPL73-A TPL77-A...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.3 Removing and fitting filter silencer or air suction branch 8.3 Removing and fitting filter silencer or air suction branch Disconnect all air lines / ducts in accordance with engine builder’s in- structions.
Page 88
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.3 Removing and fitting filter silencer or air suction branch Removing filter silencer Remove insulation where necessary. Fit swivel lifting eye (90231) to filter silencer. Pass lifting gear through rib on filter silencer.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.5 Removing the cartridge group 8.5 Removing the cartridge group CAUTION Locked safety segments (76080) during disassembly Observe the maximum tightening torque for the nuts (90458) so as not to shear off the threaded studs of the safety segments (76080).
Page 91
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.5 Removing the cartridge group Loosen and remove nuts (74027) together with washers (74018). Remove six studs (74026 / 74029) in the upper section and fit four guide studs (90320).
Page 92
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.5 Removing the cartridge group Loop the lifting device around the rear of the flange (F). Carefully rotate the compressor casing internal part with wall insert and diffuser over the support bracket (90025) and set it down with the front side of the flange (F) on the underlay.
Page 93
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.5 Removing the cartridge group Remove screws (76002). Loop lifting gear around diffuser (79000) and remove diffuser. Carefully press off the wall insert (77000) using the press-off screws (90900) and remove it using the swivel lifting eye (90230).
Page 94
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.5 Removing the cartridge group Fasten the lifting device (90190) with shackle (90195) to the com- pressor casing external part (74000) and secure it to the crane. Loosen nuts (61037).
Page 95
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.5 Removing the cartridge group Unplug cable connector (86515) and unscrew speed sensor (86505) with O-ring (86506). Disconnect oil pipes in accordance with enginebuilder's instructions. Remove screws (42064) together with flange (42044).
Page 96
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.5 Removing the cartridge group Remove the O-ring (42012). Remove the three screws (61059) and Verbus Ripp® washers (61058). Attach one lifting gear each to the two ribs of the bearing casing provided for this purpose.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring 8.6 Dismantling and installing the turbine diffuser and nozzle ring CAUTION Falling nozzle ring The nozzle ring hangs only loosely on the positioning pins.
Page 98
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring Position clamp (90921) over stud (61036) until it lies flat against inner radius of gas outlet casing. Insert extension (A) of torque spanner (B) through hole in clamp and loosen screws (61056) (61057) one after other.
Page 99
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring Replace two screws (61056) in the gas outlet casing with two guide studs (90320) in the upper section of the turbine diffuser (63000). Fit clamps (90921) over guide studs (90320) and studs (61036) To secure the work, screw nuts (61037) onto start of stud threads (61036).
Page 100
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.6 Dismantling and installing the tur- bine diffuser and nozzle ring Attach the holder (90490) to the gas outlet casing. Pull the nozzle ring (56001) in the forward direction, fasten it to the lifting gear and remove it.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.7 Fitting the cartridge group 8.7 Fitting the cartridge group CAUTION Oil orifices There is an orifice for adjusting the oil pressure in each of the two oil supply pipes of the bearing casing.
Page 102
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.7 Fitting the cartridge group CAUTION If the rotor blades have insufficient or no clearance, the blades and cas- ing could be damaged. Check that the blades do not rub on the turbine diffuser by rotating the rotor.
Page 103
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.7 Fitting the cartridge group Fasten set-down compressor casing external part (74000) to crane using lifting device (90190) and shackle (90195). Screw three press-off nuts (61090) onto bearing casing studs, equally distributed around circumference, and screw up to end of thread by hand.
Page 104
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.7 Fitting the cartridge group Fit O-rings (77005 and 77006) to wall insert (77000). Fit lifting gear and swivel lifting eyes (90230). Align wall insert (77000) with threaded holes in compressor casing in- ternal part (76000) using spigots on swivel lifting eyes and lower it.
Page 105
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.7 Fitting the cartridge group Secure the lifting device (90190) and the shackle (90195) to the rear of the flange (F). Carefully turn compressor casing internal part complete with wall in- sert and diffuser about support angle (90025) into vertical position and set down on underlay and support angle.
Page 106
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.7 Fitting the cartridge group Check that nuts (90458) on three safety segments have been tightened. Fasten lifting device (90190) complete with shackle (90195) to front side of flange (F).
Page 107
Put the nuts (90458) back in the toolbox. Measure and note axial clearance (see section Axial clearance). CAUTION If the axial clearance (A) is out of tolerance, an ABB Turbocharging Ser- vice Station must be contacted. Remove four nuts (74027) and washers (74018) again.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end 8.8 Dismantling and fitting nozzle ring at turbine If only the nozzle ring needs to be removed, this can be done at the tur- bine end.
Page 109
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end Flange connection disassembly Remove two hexagon-head screws (61044) together with Verbus Ripp® washers (61043) from the bottom section and replace them with two studs (90177).
Page 110
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end Segment connection disassembly Fig. 2 Loosen screws (61044) and remove segments (51012). Fit two studs (90177) in the bottom section. Pull gas inlet casing (51001) together with nozzle ring (56001) away from gas outlet casing (61001) until the nozzle ring can be lifted out.
Page 111
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end Flange connection assembly Carefully clean slots and contact surfaces of the casings and keep them free of metal chips. Keep slots and spiral-wound gasket free of oil and grease.
Page 112
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end Segment connection assembly Carefully clean slots and contact surfaces of the casings and keep them free of metal chips. Keep slots and spiral-wound gasket free of oil and grease.
Page 113
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring at turbine end Tightening procedure and order: NOTICE Screw tightening sequence The screw positioning numbers must be marked on the component. This enables simple and efficient tightening.
45% of n . Take note of the rating plate. Bmax After locking the turbocharger, contact an ABB Turbocharging Ser- vice Station and find the nearest port. Observe the safety regulations. Follow the directives of the enginebuilder.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.2 Locking the rotor 9.2 Locking the rotor CAUTION A locked rotor must be removed after the turbocharger repair and checked for unbalance. NOTICE An exception is a test rig run up to maximum 25% engine load on new engines with one or several turbochargers, which is sometimes reques-...
Page 118
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.2 Locking the rotor Table of tightening Part number TPL69-A TPL73-A TPL77-A torques [Nm] 74027 94006 94007 NOTICE Carried out work as described in the chapter Disassembly and as- sembly.
Page 119
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.2 Locking the rotor ð In the case of engines with three or four turbochargers, the balancing screws should be removed from the compressor wheel concerned. ð...
Page 120
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.2 Locking the rotor Compressor type CV 20 CAUTION Make sure all components are clean and free from grease. Push intermediate rings (94001 and/or 94002) and assembly-disas- sembly device (90020) onto locking flange (94003) in correct order.
Page 121
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.2 Locking the rotor Further measures and information for operation with blocked rotor for 4-stroke engines 4-stroke engine with one turbocharger No further measures are necessary.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.3 Fit cover plate 9.3 Fit cover plate NOTICE The cover plate (material: General structural steel, in accordance with DIN EN 10025-2) must be manufactured in-house according to the drawing.
Page 124
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.3 Fit cover plate Close off opening in gas outlet casing using cover plate. Fasten cover plate using spacer sleeves and nuts (61037). CAUTION Shut off the supply of lubricating oil to the turbocharger.
Page 125
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.3 Fit cover plate Further measures and information for operation with a turbocharger with cover plate on 4-stroke engines 4-stroke engine with one turbocharger No further measures are necessary.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 9 Taking out of operation at short notice / 9.4 Blocking the inlets and outlets 9.4 Blocking the inlets and outlets CAUTION Shut off the lubricating oil supply to the turbocharger. Shut off compressor casing outlet, gas inlet and gas outlet by fitting cover plates.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 10 Mothballing the turbocharger / 10.1 Taking the engine out of opera- tion for up to 12 months 10 Mothballing the turbocharger 10.1 Taking the engine out of operation for up to 12 months Condition of engine lubricating oil The turbocharger normally remains mounted on the engine.
Page 128
Dismantle the turbocharger. The rotor and the bearing parts must be removed by an official ABB Turbocharging service station and refitted afterwards. Clean all parts. Machined, bright surfaces of steel and cast parts must be oiled with anticorrosive oil.
The turbocharger casing remains mounted on the engine, but the ro- tor and the bearing parts are removed and stored separately by an ABB Turbocharging Service Station. ¡ The turbocharger is removed completely, either as a whole or in indi- vidual parts.
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 11 Disposing of turbocharger components / 11 Disposing of turbocharger components WARNING Handling damaged thermal insulation Damaged thermal insulation can lead to dust exposure. The glass fibres can cause mechanical irritation of the eyes, skin, and respiratory tracts. Avoid the formation of dust.
Serial number (HT……) ¡ Designation and part number. Spare parts can be ordered from an official ABB Turbocharging service station. If different design versions have not been taken into consideration in this document, please contact an ABB Turbocharging service station.
Page 133
CAUTION Leaks Improper assembly of the cleaning pipe and the nozzles can lead to leaks and failure of the turbine cleaning system. Have work on the turbine cleaning system carried out by an ABB Tur- bocharging Service Station. Quantity Description...
Page 135
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 12 Spare parts / 12.2 View of turbocharger with part numbers Part number Description 10900 Cartridge group 42012 (in customer spare part O-ring set) 42124 (in customer spare part O-ring (option with compressor wheel cool- set) ing) 51001...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30 12 Spare parts / 12.3 View of turbine cleaning system with part num- bers (optional) 12.3 View of turbine cleaning system with part numbers (optional) Part number Description 51229 Cleaning pipe 52249 Holder complete 51255 (in spare parts set)