2-5: LOADING MOTOR/WORM (Refer to Fig. 2-5-A)
Remove the screw 1.
1.
2.
Remove the Loading Motor.
3.
Remove the Worm.
Main Chassis
• Screw Torque: 3 ± 0.5kgf•cm
NOTE
1.
In case of the Worm installation, check if the value of the
Fig. 2-5-B is correct.
2.
In case of the Loading Motor installation, hook the wire on
the Cassette Opener as shown Fig. 2-5-C.
3.
When installing the wires between Capstan DD Unit and
Loading Motor, connect them correctly as shown Fig. 2-5-D.
Safety surface for pressing
of the insert.
Pink
Loading Motor
-
+
White
DISASSEMBLY INSTRUCTIONS
Loading Motor
Worm
1
Fig. 2-5-A
19.2 ± 0.1mm
Fig. 2-5-B
Loading Motor
Cassette Opener
Fig. 2-5-C
Capstan DD Unit
L2
L1
Fig. 2-5-D
2-6: TENSION ASS'Y (Refer to Fig. 2-6-B)
1.
Turn the Pinch Roller Cam clockwise so that the Tension
Holder hook is set to the position of Fig. 2-6-A to move
the Tension Arm Ass'y.
2.
Remove the Tension Spring.
Unlock the 2 supports 1 and remove the Tension Band.
3.
Unlock the support 2 and remove the Tension Arm Ass'y.
4.
Unlock the support 3 and remove the Tension Connect.
5.
Float the hook 4 and turn it clockwise then remove the
6.
Tension Holder.
Tension Arm Ass'y
Tension Connect
Tension Spring
NOTE
1.
In case of the Tension Band installation, note the direc-
tion of the installation. (Refer to Fig. 2-6-C)
2.
In case of the Tension Band installation, install correctly
as Fig. 2-6-D.
3.
In case of the Tension Connect installation, install as the
circled section of Fig. 2-6-E.
Tension Connect
B2-2
Fig. 2-6-A
1
1
Tension Band
3
Tension Arm Ass'y
Tension Holder
2
4
Fig. 2-6-B
Tension Band
Fig. 2-6-C